Quantification of flood risk mitigation benefits: A building-scale damage assessment through the RASOR platform

被引:51
作者
Arrighi, Chiara [1 ]
Rossi, Lauro [2 ]
Trasforini, Eva [2 ]
Rudari, Roberto [2 ]
Ferraris, Luca [2 ,3 ]
Brugioni, Marcello [4 ]
Franceschini, Serena [4 ]
Castelli, Fabio [1 ]
机构
[1] Univ Florence, Dept Civil & Environm Engn, Via S Marta 3, I-50139 Florence, Italy
[2] CIMA Res Fdn, Univ Campus, Savona, Italy
[3] Univ Genoa, DIBRIS, Via Magliotto 2, Savona, Italy
[4] Autorita Bacino Fiume Arno, Via Servi 15, Florence, Italy
关键词
Cost-benefit analysis; Exposure; Recovery cost; Retention basin; GIS; RIVER FLOODS; HAZARDS; COSTS; BASIN; MODEL;
D O I
10.1016/j.jenvman.2017.11.017
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Flood risk mitigation usually requires a significant investment of public resources and cost-effectiveness should be ensured. The assessment of the benefits of hydraulic works requires the quantification of (i) flood risk in absence of measures, (ii) risk in presence of mitigation works, (iii) investments to achieve acceptable residual risk. In this work a building-scale is adopted to estimate direct tangible flood losses to several building classes (e.g. residential, industrial, commercial, etc.) and respective contents, exploiting various sources of public open data in a GIS environment. The impact simulations for assigned flood hazard scenarios are computed through the RASOR platform which allows for an extensive characterization of the properties and their vulnerability through libraries of stage-damage curves. Recovery and replacement costs are estimated based on insurance data, market values and socio-economic proxies. The methodology is applied to the case study of Florence (Italy) where a system of retention basins upstream of the city is under construction to reduce flood risk. Current flood risk in the study area (70 km(2)) is about 170 Mio euros per year without accounting for people, infrastructures, cultural heritage and vehicles at risk. The monetary investment in the retention basins is paid off in about 5 years. However, the results show that although hydraulic works are cost-effective, a significant residual risk has to be managed and the achievement of the desired level of acceptable risk would require about 1 billion euros of investments. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:92 / 104
页数:13
相关论文
共 44 条
[31]   Review article: Assessing the costs of natural hazards - state of the art and knowledge gaps [J].
Meyer, V. ;
Becker, N. ;
Markantonis, V. ;
Schwarze, R. ;
van den Bergh, J. C. J. M. ;
Bouwer, L. M. ;
Bubeck, P. ;
Ciavola, P. ;
Genovese, E. ;
Green, C. ;
Hallegatte, S. ;
Kreibich, H. ;
Lequeux, Q. ;
Logar, I. ;
Papyrakis, E. ;
Pfurtscheller, C. ;
Poussin, J. ;
Przyluski, V. ;
Thieken, A. H. ;
Viavattene, C. .
NATURAL HAZARDS AND EARTH SYSTEM SCIENCES, 2013, 13 (05) :1351-1373
[32]   Modelling the benefits of flood emergency management measures in reducing damages: a case study on Sondrio, Italy [J].
Molinari, D. ;
Ballio, F. ;
Menoni, S. .
NATURAL HAZARDS AND EARTH SYSTEM SCIENCES, 2013, 13 (08) :1913-1927
[33]   Understanding risk: what makes a risk assessment successful? [J].
Murnane, Richard ;
Simpson, Alanna ;
Jongman, Brenden .
INTERNATIONAL JOURNAL OF DISASTER RESILIENCE IN THE BUILT ENVIRONMENT, 2016, 7 (02) :186-200
[34]   Comparing Methods of Calculating Expected Annual Damage in Urban Pluvial Flood Risk Assessments [J].
Olsen, Anders Skovgard ;
Zhou, Qianqian ;
Linde, Jens Jorgen ;
Arnbjerg-Nielsen, Karsten .
WATER, 2015, 7 (01) :255-270
[35]  
Panattoni L., 1979, EOS Transactions of the American Geophysical Union, V60, P1, DOI 10.1029/EO060i001p00001-01
[36]   Who benefits and who loses from flood risk reduction? [J].
Penning-Rowsell, Edmund C. ;
Pardoe, Joanna .
ENVIRONMENT AND PLANNING C-GOVERNMENT AND POLICY, 2012, 30 (03) :448-466
[37]   Damage functions for climate-related hazards: unification and uncertainty analysis [J].
Prahl, Boris F. ;
Rybski, Diego ;
Boettle, Markus ;
Kropp, Juergen P. .
NATURAL HAZARDS AND EARTH SYSTEM SCIENCES, 2016, 16 (05) :1189-1203
[38]   Climate change and river floods in the European Union: Socio-economic consequences and the costs and benefits of adaptation [J].
Rojas, Rodrigo ;
Feyen, Luc ;
Watkiss, Paul .
GLOBAL ENVIRONMENTAL CHANGE-HUMAN AND POLICY DIMENSIONS, 2013, 23 (06) :1737-1751
[39]   Large wood clogging during floods in a gravel-bed river: the Dlugopole bridge in the Czarny Dunajec River, Poland [J].
Ruiz-Villanueva, Virginia ;
Wyzga, Bartlomiej ;
Mikus, Pawel ;
Hajdukiewicz, Maciej ;
Stoffel, Markus .
EARTH SURFACE PROCESSES AND LANDFORMS, 2017, 42 (03) :516-530
[40]  
Scawthorn C., 2006, NAT HAZARDS REV, V7, P60, DOI [10.1061/(asce)1527-6988(2006)7:2(72), DOI 10.1061/(ASCE)1527-6988(2006)7:2(72)]