A study on linear scheduling methods in road construction projects

被引:4
|
作者
Yogesh, G. [1 ]
Rao, Ch Hanumanth [1 ]
机构
[1] Deemed Univ, Koneru Lakshmaiah Educ Fdn, Dept Civil Engn, Guntur 522502, Andhra Pradesh, India
关键词
Scheduling; Pavement; Construction; Highway; Planning;
D O I
10.1016/j.matpr.2021.07.393
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Construction industry plays a major role in the economic development of a Nation. Trade and commerce in any country have always depended on the construction industry to deliver the infrastructure facilities promptly. In the construction of National highway No: 65, a crucial observation is made. There had been certain strategies utilised in the process of starting the project, in which I had a keen observation and been listed in their potential domains. In the construction of National No: 65, a crucial observation is made. There had been certain strategies utilised in the process of starting the project, Because of the nature of the link between its activities and execution style, these approaches have been shown to be insufficient for scheduling projects such as motorways. These are known as linear projects, and they generally consist of activities that cover the whole project's duration, with subsequent activities progressing at the same time while preserving a buffer time and distance between them. (c) 2021 Elsevier Ltd. All rights reserved. Selection and peer-review under responsibility of the International Conference on Sustainable materials, Manufacturing and Renewable Technologies 2021.
引用
收藏
页码:5475 / 5478
页数:4
相关论文
共 50 条
  • [41] Study on the Use of Construction and Demolition Waste for Road Base or Subbase Pavement Construction in Hanoi
    Hiep, Nguyen Trong
    Khang, Pham Huy
    Thong, Pham Quang
    JOURNAL OF MATERIALS AND ENGINEERING STRUCTURES, 2022, 9 (04): : 467 - 475
  • [42] Fast and Accurate Risk Evaluation for Scheduling Large-Scale Construction Projects
    Jun, Dho Heon
    El-Rayes, Khaled
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2011, 25 (05) : 407 - 417
  • [43] Percentage of workable days in scheduling superstructure work for building construction projects in Korea
    Young Gu Han
    Kyu Man Cho
    Tae Hoon Hong
    Chang Taek Hyun
    KSCE Journal of Civil Engineering, 2012, 16 : 517 - 525
  • [44] Percentage of workable days in scheduling superstructure work for building construction projects in Korea
    Han, Young Gu
    Cho, Kyu Man
    Hong, Tae Hoon
    Hyun, Chang Taek
    KSCE JOURNAL OF CIVIL ENGINEERING, 2012, 16 (04) : 517 - 525
  • [45] A TRADE-OFF BETWEEN TIME AND COST IN SCHEDULING REPETITIVE CONSTRUCTION PROJECTS
    Zhang, Lihui
    Zou, Xin
    Qi, Jianxun
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2015, 11 (04) : 1423 - 1434
  • [46] A taxonomy of planning and scheduling methods to support their more efficient use in construction project management
    Al Nasseri, Hammad Abdullah
    Widen, Kristian
    Aulin, Radhlinah
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2016, 14 (03) : 580 - 601
  • [47] Advanced Methods for Solving the Problems of Road Construction in Central Kazakhstan
    Kadyrov, Adil
    Kunaev, Vyacheslav
    Georgiadi, Ivan
    Khaibullin, Rashid
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2019, 26 (04): : 1159 - 1163
  • [48] A systemic archetype for enhancing occupational safety in road construction projects through worker behavior
    Das, Dillip Kumar
    Aiyetan, Ayodeji Olatunji
    Mostafa, Mohamed Mostafa Hassan
    TRANSPORTATION RESEARCH INTERDISCIPLINARY PERSPECTIVES, 2024, 26
  • [49] ACHIEVING SUSTAINABLE CONSTRUCTION WITHIN PRIVATE FINANCE INITIATIVE (PFI) ROAD PROJECTS IN THE UK
    Akbiyikli, Rifat
    Eaton, David
    Dikmen, Seyyit Umit
    TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2012, 18 (02) : 207 - 229
  • [50] Optimized crew selection for scheduling of repetitive projects
    Roghabadi, Mohammadjavad Arabpour
    Moselhi, Osama
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (06) : 1517 - 1540