A study on linear scheduling methods in road construction projects

被引:4
|
作者
Yogesh, G. [1 ]
Rao, Ch Hanumanth [1 ]
机构
[1] Deemed Univ, Koneru Lakshmaiah Educ Fdn, Dept Civil Engn, Guntur 522502, Andhra Pradesh, India
关键词
Scheduling; Pavement; Construction; Highway; Planning;
D O I
10.1016/j.matpr.2021.07.393
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Construction industry plays a major role in the economic development of a Nation. Trade and commerce in any country have always depended on the construction industry to deliver the infrastructure facilities promptly. In the construction of National highway No: 65, a crucial observation is made. There had been certain strategies utilised in the process of starting the project, in which I had a keen observation and been listed in their potential domains. In the construction of National No: 65, a crucial observation is made. There had been certain strategies utilised in the process of starting the project, Because of the nature of the link between its activities and execution style, these approaches have been shown to be insufficient for scheduling projects such as motorways. These are known as linear projects, and they generally consist of activities that cover the whole project's duration, with subsequent activities progressing at the same time while preserving a buffer time and distance between them. (c) 2021 Elsevier Ltd. All rights reserved. Selection and peer-review under responsibility of the International Conference on Sustainable materials, Manufacturing and Renewable Technologies 2021.
引用
收藏
页码:5475 / 5478
页数:4
相关论文
共 50 条
  • [31] EVALUATION OF ROAD CONSTRUCTION PROJECTS BY VALUE ENGINEERING APPROACH AS A TOOL FOR SUSTAINABILITY
    Reihanifar, Masoud
    Naimi, Sepanta
    INTERNATIONAL JOURNAL OF ECOSYSTEMS AND ECOLOGY SCIENCE-IJEES, 2018, 8 (02): : 339 - 346
  • [32] Analytical methods to reduce uncertainty in tunnel construction projects
    Ruwanpura, JY
    AbouRizk, SM
    Allouche, M
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2004, 31 (02) : 345 - 360
  • [33] Finance-based scheduling of construction projects using integer programming
    Elazouni, AM
    Gab-Allah, AA
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2004, 130 (01): : 15 - 24
  • [34] Improved Critical Chain Project Management Framework for Scheduling Construction Projects
    Ma, Guofeng
    Wang, Aimin
    Li, Nan
    Gu, Lingyun
    Ai, Qi
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (12)
  • [35] Entropy-based scheduling of resource-constrained construction projects
    Christodoulou, Symeon
    Ellinas, Georgios
    Aslani, Pooyan
    AUTOMATION IN CONSTRUCTION, 2009, 18 (07) : 919 - 928
  • [36] Overall multiobjective optimization of construction projects scheduling using particle swarm
    Elbeltagi, Emad
    Ammar, Mohammed
    Sanad, Haytham
    Kassab, Moustafa
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2016, 23 (03) : 265 - 282
  • [37] Non-unit-based planning and scheduling of repetitive construction projects
    Huang, Rong-Yau
    Sun, Kuo-Shun
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (06) : 585 - 597
  • [38] Productivity scheduling method compared to linear and repetitive project scheduling methods
    Lucko, Gunnar
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (09) : 711 - 720
  • [39] Training to protect natural resources on large linear construction projects
    Filler, T
    PROCEEDINGS OF CONFERENCE 31 - INTERNATIONAL EROSION CONTROL ASSOCIATION, 2000, : 321 - 323
  • [40] Simultaneous multi-criteria optimization for scheduling linear infrastructure projects
    Eid, Mohamed S.
    Elbeltagi, Emad E.
    El-Adaway, Islam H.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (01) : 41 - 55