A study on linear scheduling methods in road construction projects

被引:4
|
作者
Yogesh, G. [1 ]
Rao, Ch Hanumanth [1 ]
机构
[1] Deemed Univ, Koneru Lakshmaiah Educ Fdn, Dept Civil Engn, Guntur 522502, Andhra Pradesh, India
关键词
Scheduling; Pavement; Construction; Highway; Planning;
D O I
10.1016/j.matpr.2021.07.393
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Construction industry plays a major role in the economic development of a Nation. Trade and commerce in any country have always depended on the construction industry to deliver the infrastructure facilities promptly. In the construction of National highway No: 65, a crucial observation is made. There had been certain strategies utilised in the process of starting the project, in which I had a keen observation and been listed in their potential domains. In the construction of National No: 65, a crucial observation is made. There had been certain strategies utilised in the process of starting the project, Because of the nature of the link between its activities and execution style, these approaches have been shown to be insufficient for scheduling projects such as motorways. These are known as linear projects, and they generally consist of activities that cover the whole project's duration, with subsequent activities progressing at the same time while preserving a buffer time and distance between them. (c) 2021 Elsevier Ltd. All rights reserved. Selection and peer-review under responsibility of the International Conference on Sustainable materials, Manufacturing and Renewable Technologies 2021.
引用
收藏
页码:5475 / 5478
页数:4
相关论文
共 50 条
  • [21] A Fixed Start Scheduling Approach for Repetitive Construction Projects
    Francisco Moreno
    Francisco Orozco
    Omar Rojas
    Bolivar Senior
    Mani Poshdar
    Eric Forcael
    KSCE Journal of Civil Engineering, 2020, 24 : 1671 - 1682
  • [22] A Fixed Start Scheduling Approach for Repetitive Construction Projects
    Moreno, Francisco
    Orozco, Francisco
    Rojas, Omar
    Senior, Bolivar
    Poshdar, Mani
    Forcael, Eric
    KSCE JOURNAL OF CIVIL ENGINEERING, 2020, 24 (6) : 1671 - 1682
  • [23] Generic Scheduling Optimization Model for Multiple Construction Projects
    El-Abbasy, Mohammed S.
    Elazouni, Ashraf
    Zayed, Tarek
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2017, 31 (04)
  • [24] Planning linear construction projects: automated method for the generation of earthwork activities
    Askew, WH
    Al-jibouri, SH
    Mawdesley, MJ
    Patterson, DE
    AUTOMATION IN CONSTRUCTION, 2002, 11 (06) : 643 - 653
  • [25] Estimating Construction Contingency: Accommodating the Potential for Cost Overruns in Road Construction Projects
    Love, Peter E. D.
    Sing, Chun-Pong
    Carey, Brad
    Kim, Jeong Tai
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2015, 21 (02)
  • [26] Enhanced heuristic for finance-based scheduling of construction projects
    Gajpal, Yuvraj
    Elazouni, Ashraf
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2015, 33 (07) : 531 - 553
  • [27] Development of an object-oriented scheduling model for construction projects
    Fan, SL
    Tserng, HP
    Wang, MT
    AUTOMATION IN CONSTRUCTION, 2003, 12 (03) : 283 - 302
  • [28] A Simulation-Based Scheduling Methodology for Construction Projects Considering the Potential Impacts of Delay Risks
    Camilo Paz, Juan
    Rozenboim, David
    Cuadros, Alvaro
    Cano, Sandra
    Willmer Escobar, John
    CONSTRUCTION ECONOMICS AND BUILDING, 2018, 18 (02): : 41 - 69
  • [29] A hybrid egalitarian bargaining game-DEA and sustainable network design approach for evaluating, selecting and scheduling urban road construction projects
    Mahmoudi, Reza
    Shetab-Boushehri, Seyyed-Nader
    Hejazi, Seyed Reza
    Emrouznejad, Ali
    Rajabi, Parisa
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2019, 130 : 161 - 183
  • [30] A novel approach for environmental impact assessment of road construction projects in India
    Chaudhary, Abhishek
    Akhtar, Amaan
    ENVIRONMENTAL IMPACT ASSESSMENT REVIEW, 2024, 106