Work planning in low-volume assembly lines under ergonomic constraints

被引:6
作者
Arkhipov, Dmitry [1 ,2 ]
Battaia, Olga [1 ]
Cegarra, Julien [3 ]
Lazarev, Alexander [2 ,4 ,5 ,6 ]
机构
[1] Univ Toulouse, ISAE SUPAERO, Dept Complex Syst Engn, F-31055 Toulouse, France
[2] Russian Acad Sci, VA Trapeznikov Inst Control Sci, Moscow 117342, Russia
[3] Inst Natl Univ Champollion, F-81012 Albi, France
[4] Lomonosov Moscow State Univ, Moscow 119991, Russia
[5] Moscow Inst Phys & Technol, Moscow 117303, Russia
[6] Natl Res Univ Higher Sch Econ, Moscow 101000, Russia
来源
51ST CIRP CONFERENCE ON MANUFACTURING SYSTEMS | 2018年 / 72卷
基金
俄罗斯科学基金会;
关键词
assembly lines; scheduling; assignment problem; human factors; ergonomics;
D O I
10.1016/j.procir.2018.03.019
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In order to implement the human-centric manufacturing and sustainability concepts in industry, an important effort should be done in order to model working conditions for human operators and improve them. Several studies have been conducted for mass production assembly lines where short cycle times make the work content highly repetitive. However, the case of low-volume production with long cycle times and different impacts on human operators has been rarely considered in the literature. In this paper, we develop a model to take into account the associated ergonomic risks in assembly lines with long cycle times. An optimization method is also developed in order to schedule tasks and assign the required tasks to a set of human operators taking into account the existing ergonomic risks. (C) 2018 The Authors. Published by Elsevier B.V.
引用
收藏
页码:786 / 789
页数:4
相关论文
共 17 条
[1]  
Akyol S. D., 2016, J INTELLIGENT MANUFA, V112
[2]  
Barathwaj N., 2015, J CENTRAL S U, V22
[3]  
Battini D., 2016, INT J PROD RES, V54
[4]   Hybrid approaches to optimize mixed-model assembly lines in low-volume manufacturing [J].
Biele, Alexander ;
Moench, Lars .
JOURNAL OF HEURISTICS, 2018, 24 (01) :49-81
[5]   Resource-constrained project scheduling: Notation, classification, models, and methods [J].
Brucker, P ;
Drexl, A ;
Mohring, R ;
Neumann, K ;
Pesch, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 112 (01) :3-41
[6]  
Carnahan B.J., 2001, IIE T, V33
[7]   A RENT EXTRACTION THEORY OF RIGHT OF FIRST REFUSAL [J].
Choi, Albert H. .
JOURNAL OF INDUSTRIAL ECONOMICS, 2009, 57 (02) :252-262
[8]  
Garey M. R., 1975, SIAM Journal on Computing, V4, P397, DOI 10.1137/0204035
[9]  
Gunther R. E., 1983, J OPERATIONS MANAGEM, V3
[10]   Mixed model assembly alternatives for low-volume manufacturing: The case of the aerospace industry [J].
Heike, G ;
Ramulu, M ;
Sorenson, E ;
Shanahan, P ;
Moinzadeh, K .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 72 (02) :103-120