Advanced logistics planning for offshore wind farm operation and maintenance activities

被引:111
作者
Dalgic, Yalcin [1 ]
Lazakis, Iraklis [1 ]
Dinwoodie, Iain [2 ]
McMillan, David [2 ]
Revie, Matthew [3 ]
机构
[1] Univ Strathclyde, Dept Naval Architecture Ocean & Marine Engn, Glasgow G4 0LZ, Lanark, Scotland
[2] Univ Strathclyde, Inst Energy & Environm, Glasgow G4 0LZ, Lanark, Scotland
[3] Univ Strathclyde, Dept Management Sci, Glasgow G4 0LZ, Lanark, Scotland
基金
英国工程与自然科学研究理事会;
关键词
Offshore wind; Operation and maintenance; Accessibility; Charter rate; Simulation; Logistics planning; SPEED; VESSELS; HEIGHT; RISK;
D O I
10.1016/j.oceaneng.2015.04.040
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
Offshore wind turbine technology is moving forward as a cleaner alternative to the fossil fuelled power production. However, there are a number of challenges in offshore; wind turbines are subject to different loads that are not often experienced onshore and more importantly challenging wind and wave conditions limit the operability of the vessels needed to access offshore wind farms. As the power generation capacity improves constantly, advanced planning of Operation and Maintenance (O&M) activities, which supports the developers in achieving reduced downtime, optimised availability and maximised revenue, has gained vital importance. In this context, the focus of this research is the investigation of the most cost-effective approach to allocate O&M resources which may include helicopter, crew transfer vessels, offshore access vessels, and jack-up vessels. This target is achieved through the implementation of a time domain Monte-Carlo simulation approach which includes analysis of environmental conditions (wind speed, wave height, and wave period), operational analysis of transportation systems, investigation of failures (type and frequency), and simulation of repairs. The developed methodology highlights how the O&M fleets can be operated in a cost-effective manner in order to support associated day-to-day O&M activities and sustain continuous power production. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:211 / 226
页数:16
相关论文
共 46 条
  • [11] Curvers A.P.W.M., 2004, OPTIMISATION O M COS
  • [12] Risk of collision between service vessels and offshore wind turbines
    Dai, Lijuan
    Ehlers, Soren
    Rausand, Marvin
    Utne, Ingrid Bouwer
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2013, 109 : 18 - 31
  • [13] Dalgic Y, 2014, DEVELOPMENTS IN MARITIME TRANSPORTATION AND EXPLOITATION OF SEA RESOURCES, VOL 2, P899
  • [14] Dalgic Y., 2015, P 12 DEEP SEA OFFSH
  • [15] Dalgic Y., 2015, The influence of multiple working shifts for offshore wind farm OM activities - StrathOW-OM Tool, Design Operation of Offshore Wind Farm Support Vessels
  • [16] Investigation of Optimum Crew Transfer Vessel Fleet for Offshore Wind Farm Maintenance Operations
    Dalgic, Yalcin
    Lazakis, Iraklis
    Turan, Osman
    [J]. WIND ENGINEERING, 2015, 39 (01) : 31 - 52
  • [17] Investigation of optimum jack-up vessel chartering strategy for offshore wind farm O&M activities
    Dalgic, Yalcin
    Lazakis, Iraklis
    Turan, Osman
    Judah, Sol
    [J]. OCEAN ENGINEERING, 2015, 95 : 106 - 115
  • [18] Development of a Combined Operational and Strategic Decision Support Model for Offshore Wind
    Dinwoodie, Iain
    McMillan, David
    Revie, Matthew
    Lazakis, Iraklis
    Dalgic, Yalcin
    [J]. DEEPWIND'2013 - SELECTED PAPERS FROM 10TH DEEP SEA OFFSHORE WIND R&D CONFERENCE, 2013, 35 : 157 - 166
  • [19] DNV, 2011, DES OFFSH WIND TURB, P1
  • [20] Fingersh L, 2006, FINO 1 2 3 FORSCH NO