IP Start-up Control for 300MW Turbine Unit with Bypass System

被引:1
|
作者
Wang, Weibing [1 ]
Wang, Xudong [2 ]
Liu, Dongju [1 ]
机构
[1] Harbin Univ Sci & Technol, Coll Comp Sci & Technol, Harbin 150080, Peoples R China
[2] Harbin Univ Sci & Technol, Coll Elect & Elect Engn, Harbin 150080, Peoples R China
关键词
300MW Turbine Unit; IP Start-up; Bypass Control;
D O I
10.1016/j.proeng.2011.08.1115
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Based on the analysis of characters of 300MW unit IP start-up, an approach with bypass system about turbine control has been explored in this paper. Control model for IP start-up is given. The pre-warm control of IP start-up and the start-up mode switching are discussed in detail. Control logic for main valve, valve exchanging and bypass system are properly designed. The opening curve of IP regulation valve is given. The schedule is successfully applied in the IP start-up of #8 turbine system, Shalingzi power plant, China. The actually operation results shows that the control logic is right and reasonable. It's available for the system requirements. (C) 2010 Published by Elsevier Ltd. Selection and/or peer-review under responsibility of Society for Automobile, Power and Energy Engineering
引用
收藏
页数:6
相关论文
共 50 条
  • [41] Optimization of the Start-up Time of a Variable Speed Pump-Turbine Unit in Pumping Mode
    Pannatier, Y.
    Kawkabani, B.
    Nicolet, C.
    Schwery, A.
    Simond, J. -J.
    2012 XXTH INTERNATIONAL CONFERENCE ON ELECTRICAL MACHINES (ICEM), 2012, : 2126 - 2132
  • [42] STARTING A 300MW UNIT FROM DIFFERENT THERMAL STATES
    KAZARINO.SI
    ABKIN, BV
    SURKOVA, AF
    LISOVOI, VG
    THERMAL ENGINEERING, 1968, 15 (03) : 1 - &
  • [43] OPTIMIZATION OF THE START-UP TIME OF STEAM TURBOSETS WITH THE TURBOTROL-4 ELECTRONIC TURBINE CONTROL-SYSTEM
    GRUBER, H
    LOITZL, W
    BROWN BOVERI REVIEW, 1979, 66 (10): : 678 - 684
  • [44] 300 MW UNIT POWER CONTROL
    SVECHNIK.AA
    RUBIN, VB
    NEMERSKI.BV
    KORETSKI.AS
    THERMAL ENGINEERING, 1972, 18 (06) : 20 - &
  • [45] Research and Analysis of 300MW Boiler Combustion System Based on Fuzzy Control
    Liang, Weipang
    Zhang, Jinshuai
    PROCEEDINGS OF THE 30TH CHINESE CONTROL AND DECISION CONFERENCE (2018 CCDC), 2018, : 5460 - 5463
  • [46] Analysis of the 300MW steam turbine rotor's transient temperature
    He, Na-Na
    Hu, Nian-Su
    Wang, Jian-Mei
    Zhang, Jian-Jiang
    Qilunji Jishu/Turbine Technology, 2003, 45 (05):
  • [47] Economics Analysis of Retrofit of Flow Passage of a 300MW Steam Turbine
    Shi Yang
    Li Wan-Fan
    Xie Dan-mei
    Tan Cheng-cheng
    Feng Ming
    Cai Sun
    2011 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2011,
  • [48] Dynamic model development of a fixed speed stall control wind turbine at start-up
    Peters, R. R.
    Muthumuni, D.
    Bartel, T.
    Salehfar, H.
    Mann, M.
    2006 POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-9, 2006, : 3815 - +
  • [49] Design features of a 300MW nuclear power plant steam turbine
    Gao, Shu-qiang
    Li, Yuan-xi
    Dongli Gongcheng/Power Engineering, 1988, 8 (06): : 1 - 7
  • [50] Superheater Steam Temperature Control for a 300MW Boiler Unit with Inverse Dynamic Process Models
    Ma, Liangyu
    Lin, Yongjun
    Lee, Kwang Y.
    IEEE POWER AND ENERGY SOCIETY GENERAL MEETING 2010, 2010,