共 50 条
- [41] Optimization of the Start-up Time of a Variable Speed Pump-Turbine Unit in Pumping Mode 2012 XXTH INTERNATIONAL CONFERENCE ON ELECTRICAL MACHINES (ICEM), 2012, : 2126 - 2132
- [43] OPTIMIZATION OF THE START-UP TIME OF STEAM TURBOSETS WITH THE TURBOTROL-4 ELECTRONIC TURBINE CONTROL-SYSTEM BROWN BOVERI REVIEW, 1979, 66 (10): : 678 - 684
- [45] Research and Analysis of 300MW Boiler Combustion System Based on Fuzzy Control PROCEEDINGS OF THE 30TH CHINESE CONTROL AND DECISION CONFERENCE (2018 CCDC), 2018, : 5460 - 5463
- [46] Analysis of the 300MW steam turbine rotor's transient temperature Qilunji Jishu/Turbine Technology, 2003, 45 (05):
- [47] Economics Analysis of Retrofit of Flow Passage of a 300MW Steam Turbine 2011 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2011,
- [48] Dynamic model development of a fixed speed stall control wind turbine at start-up 2006 POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-9, 2006, : 3815 - +
- [49] Design features of a 300MW nuclear power plant steam turbine Dongli Gongcheng/Power Engineering, 1988, 8 (06): : 1 - 7
- [50] Superheater Steam Temperature Control for a 300MW Boiler Unit with Inverse Dynamic Process Models IEEE POWER AND ENERGY SOCIETY GENERAL MEETING 2010, 2010,