A fuzzy model for shortage planning under uncertainty due to lack of homogeneity in planned production lots

被引:13
作者
Alemany, M. M. E. [1 ]
Grillo, Hanzel [1 ]
Ortiz, A. [1 ]
Fuertes-Miquel, Vicente S. [2 ]
机构
[1] Univ Politecn Valencia, Res Ctr Prod Management & Engn CIGIP, E-46022 Valencia, Spain
[2] Univ Politecn Valencia, Dept Ingn Hidraul & Medio Ambiente, E-46022 Valencia, Spain
关键词
Fuzzy; Mathematical programming model; Shortage planning; Order promising; Lack of homogeneity in the product; Uncertainty; CHAIN NETWORK DESIGN; AVAILABLE-TO-PROMISE; LOOP SUPPLY CHAIN; PROGRAMMING APPROACH; TILE INDUSTRY; COORDINATION; OPTIMIZATION; MANAGEMENT; FRAMEWORK; DEMAND;
D O I
10.1016/j.apm.2014.12.057
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Lack of homogeneity in the product (LHP) affects several sectors like horticulture, reverse logistics, furniture, ceramics and leathers, among others. Productive processes with LHP are characterized by manufacturing units of the same finished good (FG) with certain attributes that differ and are relevant to customers. This aspect leads to the existence of different subtypes of the same FG in each production lot, which provides homogeneous sublots. Due to inherent LHP uncertainty, the size of each homogeneous sublot is not known until produced. LHP becomes a problem when customers order several units of the same FG and require homogeneity among them; i.e., being served with the same subtype. Like inherent LHP uncertainty, discrepancies between planned homogeneous quantities and the real ones is quite usual. This means it is impossible to serve committed orders with the previously defined requirements of quantity, homogeneity and due date, which brings about a shortage situation. In this paper, a fuzzy mixed integer linear programming model is proposed to support shortage planning in environments with LHP (LHP-FSP model). The LHP-FSP model aims to maximize the profits of served orders by reallocating the quantities of subtypes in stock and the uncertainty future ones in the master plan among the already committed orders. One of the main contributions of the paper is to model the fuzzy interdependent coefficients that represent the fraction of each homogeneous sublot. Finally, experiments based on realistic data from a ceramic company have been designed to validate the model and to analyze its behavior in different scenarios. (C) 2014 Elsevier Inc. All rights reserved.
引用
收藏
页码:4463 / 4481
页数:19
相关论文
共 56 条
  • [1] The lack of homogeneity in the product (LHP) in the ceramic tile industry and its impact on the reallocation of inventories
    Alarcon, F.
    Alemany, M. M. E.
    Lario, F. C.
    Oltra, R. F.
    [J]. BOLETIN DE LA SOCIEDAD ESPANOLA DE CERAMICA Y VIDRIO, 2011, 50 (01): : 49 - 57
  • [2] Available-To-Promise modeling for multi-plant manufacturing characterized by lack of homogeneity in the product: An illustration of a ceramic case
    Alemany, M. M. E.
    Lario, Francisco-Cruz
    Ortiz, A.
    Gomez, F.
    [J]. APPLIED MATHEMATICAL MODELLING, 2013, 37 (05) : 3380 - 3398
  • [3] BFC, A branch-and-fix coordination algorithmic framework for solving some types of stochastic pure and mixed 0-1 programs
    Alonso-Ayuso, A
    Escudero, LF
    Ortuño, MT
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 151 (03) : 503 - 519
  • [4] [Anonymous], 1988, Possibility Theory
  • [5] [Anonymous], 2004, HDB ENTREPRENEURIAL
  • [6] Balakrishnan A., 2000, Manufacturing & Service Operations Management, V2, P166, DOI 10.1287/msom.2.2.166.12349
  • [7] The Hahn decomposition theorem for fuzzy measures and applications
    Barbieri, G
    Lepellere, MA
    Weber, H
    [J]. FUZZY SETS AND SYSTEMS, 2001, 118 (03) : 519 - 528
  • [8] New approaches to due date assignment in job shops
    Baykasoglu, Adil
    Gocken, Mustafa
    Unutmaz, Zeynep D.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (01) : 31 - 45
  • [9] BELLMAN RE, 1970, MANAGE SCI B-APPL, V17, pB141
  • [10] Collaborative management of inventory in Australian hospital supply chains: practices and issues
    Bhakoo, Vikram
    Singh, Prakash
    Sohal, Amrik
    [J]. SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2012, 17 (02) : 217 - 230