共 27 条
[1]
Bush A., 1751, P 35 C WINT SIM DRIV
[2]
Constraint programming approach to-precast production scheduling
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2002, 128 (06)
:513-521
[5]
Davenport T., 1990, Sloan Management Review
[7]
HAMMER M, 1990, HARVARD BUS REV, V68, P104
[8]
Hammer M., 1994, REENGINEERING CORPOR
[9]
Johansson H.J., 1993, Business Process Reengineering: Break Point Strategies for Market Dominance
[10]
Kabilan V, 2005, P CAISE 2005 WORKSH, P557