GRASP Applied to Multi-Skill Resource-Constrained Project Scheduling Problem

被引:14
作者
Myszkowski, Pawel B. [1 ]
Siemienski, Jedrzej J. [1 ]
机构
[1] Wroclaw Univ Technol, Dept Computat Intelligence, Wroclaw, Poland
来源
COMPUTATIONAL COLLECTIVE INTELLIGENCE, ICCCI 2016, PT I | 2016年 / 9875卷
关键词
SIMULATED ANNEALING ALGORITHM;
D O I
10.1007/978-3-319-45243-2_37
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The paper describes an application of Greedy Randomized Adaptive Search Procedure (GRASP) in solving Multi-Skill Resource-Constrained Project Scheduling Problem (MS-RCPSP). Proposed work proposes a specific greedy-based local search and schedule constructor specialised to MS-RCPSP. The GRASP is presented as the better option to classical heuristic but also as a faster and successful alternative to another metaheuristic. To compare results of GRASP to others approaches, various methods are proposed: methods of constructing scheduling based on the greedy algorithm, randomized greedy approach, and HAntCO. The research was performed using all instances of benchmark iMOPSE dataset and the results compared to best-known methods.
引用
收藏
页码:402 / 411
页数:10
相关论文
共 18 条
[1]  
Al-Anzi F. S., 2010, J SOFTWARE ENG APPL, V3, P1125
[2]   Resource-Constrained Project Scheduling for Timely Project Completion with Stochastic Activity Durations [J].
Ballestin, Francisco ;
Leus, Roel .
PRODUCTION AND OPERATIONS MANAGEMENT, 2009, 18 (04) :459-474
[3]   HEURISTICS FOR SCHEDULING PROJECTS WITH RESOURCE RESTRICTIONS AND SEVERAL RESOURCE-DURATION MODES [J].
BOCTOR, FF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (11) :2547-2558
[4]   A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version [J].
Bouleimen, K ;
Lecocq, H .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 149 (02) :268-281
[5]   A survey of variants and extensions of the resource-constrained project scheduling problem [J].
Hartmann, Soenke ;
Briskorn, Dirk .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 207 (01) :1-14
[6]   Scheduling projects with multi-skilled personnel by a hybrid MILP/CP benders decomposition algorithm [J].
Li, Haitao ;
Womer, Keith .
JOURNAL OF SCHEDULING, 2009, 12 (03) :281-298
[7]   The software project scheduling problem: A scalability analysis of multi-objective metaheuristics [J].
Luna, Francisco ;
Gonzalez-Alvarez, David L. ;
Chicano, Francisco ;
Vega-Rodriguez, Miguel A. .
APPLIED SOFT COMPUTING, 2014, 15 :136-148
[8]   A random key based genetic algorithm for the resource constrained project scheduling problem [J].
Mendes, J. J. M. ;
Goncalves, J. F. ;
Resende, M. G. C. .
COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (01) :92-109
[9]   Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem [J].
Myszkowski, Pawel B. ;
Skowronski, Marek E. ;
Olech, Lukasz P. ;
Oslizlo, Krzysztof .
SOFT COMPUTING, 2015, 19 (12) :3599-3619
[10]   A new benchmark dataset for Multi-Skill Resource-Constrained Project Scheduling Problem [J].
Myszkowski, Pawel B. ;
Skowronski, Marek E. ;
Sikora, Krzysztof .
PROCEEDINGS OF THE 2015 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS, 2015, 5 :129-138