Transmission expansion in Argentina 2: The fourth line revisited

被引:12
|
作者
Littlechild, Stephen C. [1 ]
Skerk, Carlos J. [2 ]
机构
[1] Judge Business Sch, Cambridge CB2 1AG, England
[2] Mercados Energet, Buenos Aires, DF, Argentina
基金
英国经济与社会研究理事会;
关键词
Argentina; electricity; transmission; regulation;
D O I
10.1016/j.eneco.2007.12.007
中图分类号
F [经济];
学科分类号
02 ;
摘要
In 1992, Argentina introduced the Public Contest method, which required transmission users to propose, vote and pay for major expansions of the electricity transmission system. Economists, consultants, the regulator and others held the application of this method to be unsuccessful, mainly on the ground that "for many years" it delayed investment in a "much needed" Fourth Line to Buenos Aires. The commentators blamed externalities, free-rider problems, the Area of Influence method used to define voting rights, and transactions costs. This paper re-examines the history and economics of the Fourth Line. The delay to the Fourth Line was short (a year and a half rather than many years) and enabled a significant reduction in construction costs. Externalities, free-riding, the Area of Influence method and transactions costs were not problematic. The Fourth Line was initially rejected because it was unprofitable to key beneficiaries. Far from being much needed, the Fourth Line was not economic because the congestion it avoided was worth less than the cost of building it. It had become more economic to transport gas to generate electricity near Buenos Aires than to transmit electricity over long distances. The location of subsequent power stations reflected this. Even though the presence of a subsidy meant that the Public Contest method did not prevent the building of the Fourth Line, it nonetheless forced a much-needed reappraisal of traditional transmission investment policy. (c) 2008 Elsevier B.V All rights reserved.
引用
收藏
页码:1385 / 1419
页数:35
相关论文
共 50 条
  • [31] Efficient moment method solution for the parallel-plates transmission line revisited
    Haridim, M
    Matzner, H
    Thirer, N
    INTERNATIONAL JOURNAL OF ENGINEERING EDUCATION, 2006, 22 (02) : 323 - 328
  • [32] The expansion of grain ports in Argentina
    Ibañez, CM
    SUSTAINABLE DEVELOPMENT AND PLANNING II, VOLS 1 AND 2, 2005, 84 : 989 - 994
  • [33] 1/N EXPANSION FOR THE YUKAWA POTENTIAL REVISITED .2.
    CHATTERJEE, A
    JOURNAL OF PHYSICS A-MATHEMATICAL AND GENERAL, 1986, 19 (17): : 3707 - 3710
  • [34] A transmission line is always a transmission line
    Johnson, H
    EDN, 2002, 47 (07) : 24 - 24
  • [35] Polynomial chaos expansion for sensitivity analysis of two types of transmission line models
    Chen, Weiwei
    Qi, Ziyang
    Ji, Yuhang
    Yan, Liping
    Zhao, Xiang
    AIP ADVANCES, 2024, 14 (02)
  • [36] An Operational State Aggregation Technique for Transmission Expansion Planning Based on Line Benefits
    Ploussard, Quentin
    Olmos, Luis
    Ramos, Andres
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2017, 32 (04) : 2744 - 2755
  • [37] Substation and Transmission Line Expansion Planning Using Adaptive Tabu Search Algorithm
    Chatthaworn, Rongrit
    Chaitusaney, Surachai
    2013 10TH INTERNATIONAL CONFERENCE ON ELECTRICAL ENGINEERING/ELECTRONICS, COMPUTER, TELECOMMUNICATIONS AND INFORMATION TECHNOLOGY (ECTI-CON), 2013,
  • [38] Electrical Parameter and Electromagnetic Transient of 500 kV Bundle Expansion Transmission Line
    Li, Yan
    Liang, Xi-dong
    2011 INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SYSTEMS SCIENCE AND ENGINEERING (ICESSE 2011), VOL 2, 2011, : 199 - 206
  • [39] The Effects of Transmission Line High-Speed Reclosing on Turbine-Generators Revisited
    Hurley, Joseph D.
    2012 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING, 2012,
  • [40] LaRonde expansion set for fourth quarter
    不详
    E&MJ-ENGINEERING AND MINING JOURNAL, 2002, 203 (09): : 8 - 8