Transmission expansion in Argentina 2: The fourth line revisited

被引:12
|
作者
Littlechild, Stephen C. [1 ]
Skerk, Carlos J. [2 ]
机构
[1] Judge Business Sch, Cambridge CB2 1AG, England
[2] Mercados Energet, Buenos Aires, DF, Argentina
基金
英国经济与社会研究理事会;
关键词
Argentina; electricity; transmission; regulation;
D O I
10.1016/j.eneco.2007.12.007
中图分类号
F [经济];
学科分类号
02 ;
摘要
In 1992, Argentina introduced the Public Contest method, which required transmission users to propose, vote and pay for major expansions of the electricity transmission system. Economists, consultants, the regulator and others held the application of this method to be unsuccessful, mainly on the ground that "for many years" it delayed investment in a "much needed" Fourth Line to Buenos Aires. The commentators blamed externalities, free-rider problems, the Area of Influence method used to define voting rights, and transactions costs. This paper re-examines the history and economics of the Fourth Line. The delay to the Fourth Line was short (a year and a half rather than many years) and enabled a significant reduction in construction costs. Externalities, free-riding, the Area of Influence method and transactions costs were not problematic. The Fourth Line was initially rejected because it was unprofitable to key beneficiaries. Far from being much needed, the Fourth Line was not economic because the congestion it avoided was worth less than the cost of building it. It had become more economic to transport gas to generate electricity near Buenos Aires than to transmit electricity over long distances. The location of subsequent power stations reflected this. Even though the presence of a subsidy meant that the Public Contest method did not prevent the building of the Fourth Line, it nonetheless forced a much-needed reappraisal of traditional transmission investment policy. (c) 2008 Elsevier B.V All rights reserved.
引用
收藏
页码:1385 / 1419
页数:35
相关论文
共 50 条
  • [21] Of the plan to the policy of creation of new national universities in Argentina: the institutional expansion of the 70s revisited
    Rovelli, Laura
    TEMAS Y DEBATES, 2009, (17): : 117 - 137
  • [22] HVDC Link and HVAC Transmission Line Comparison in Transmission Expansion Considering Social Welfare Maximization
    Rahmatian, M.
    Rahiminejad, A.
    Hosseinian, S. H.
    Gharehpetian, G. B.
    Sanjari, M. J.
    INTERNATIONAL REVIEW OF ELECTRICAL ENGINEERING-IREE, 2012, 7 (05): : 5818 - 5828
  • [23] Hybrid expansion revisited
    Yokell, Stanley
    JOURNAL OF PRESSURE VESSEL TECHNOLOGY-TRANSACTIONS OF THE ASME, 2007, 129 (03): : 482 - 487
  • [24] MULTIPOLE EXPANSION REVISITED
    VANBLADEL, J
    AEU-INTERNATIONAL JOURNAL OF ELECTRONICS AND COMMUNICATIONS, 1977, 31 (10): : 407 - 411
  • [25] Transmission expansion with smart switching under demand uncertainty and line failures
    Schumacher K.M.
    Chen R.L.-Y.
    Cohn A.E.M.
    Schumacher, Kathryn M. (kathryn.schumacher@gm.com), 2017, Springer Verlag (08) : 549 - 580
  • [26] Transmission and Generation Expansion Planning Considering System Reliability and Line Maintenance
    Mahdavi, Meisam
    Macedo, Leonardo H.
    Romero, Ruben
    26TH IRANIAN CONFERENCE ON ELECTRICAL ENGINEERING (ICEE 2018), 2018, : 1005 - 1010
  • [27] A Genetic Algorithm for Transmission Network Expansion Planning Considering Line Maintenance
    Mahdavi, Meisam
    Kheirkhah, Ali Reza
    Macedo, Leonardo H.
    Romero, Ruben
    2020 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2020,
  • [28] Median aperture of the fourth ventricle revisited
    Ciolkowski, M.
    Sharifi, M.
    Tarka, S.
    Ciszek, B.
    FOLIA MORPHOLOGICA, 2011, 70 (02) : 84 - 90
  • [29] The Fourth Wall Women of Vision Revisited
    Adeyemi, Toni
    Hodoyan, Karina
    Dunye, Cheryl
    FEMINIST MEDIA HISTORIES, 2019, 5 (04) : 68 - 75
  • [30] Maximum range expansion of line network by full diversity cooperative transmission
    Zheng, Wenbin
    Yin, Hongtao
    Fu, Ping
    Liu, Bing
    ICIC Express Letters, 2015, 9 (05): : 1485 - 1491