共 27 条
[1]
Amari SV, 2008, P REL MAINT S, P443
[5]
PROFIT ANALYSIS OF A 2-UNIT REDUNDANT SYSTEM WITH PROVISION FOR REST AND CORRELATED FAILURES AND REPAIRS
[J].
MICROELECTRONICS AND RELIABILITY,
1991, 31 (05)
:827-833
[6]
A COMPLEX 2-UNIT SYSTEM WITH RANDOM BREAKDOWN OF REPAIR FACILITY
[J].
MICROELECTRONICS AND RELIABILITY,
1995, 35 (02)
:299-302
[9]
Jain Madhu, 2017, Journal of Industrial Engineering International, V13, P171, DOI [10.1007/s40092-016-0180-8, 10.1007/s40092-016-0180-8]
[10]
Fuzzy Reliability Evaluation of a Repairable System with Imperfect Coverage, Reboot and Common-cause Shock Failure
[J].
INTERNATIONAL JOURNAL OF ENGINEERING,
2012, 25 (03)
:231-238