共 5 条
- [1] [Anonymous], 2010, OP SUPP COST EST
- [2] Hines J., 2009, ANN C PROGN HLTH MAN, P1
- [3] IMPACT OF LOGISTICS ON READINESS AND LIFE CYCLE COST: A DESIGN OF EXPERIMENTS APPROACH [J]. PROCEEDINGS OF THE 2010 WINTER SIMULATION CONFERENCE, 2010, : 1336 - 1346
- [4] Smith V.D, 2006, P 2010 WINT SIM C
- [5] UPADHYA KS, 2003, INT J RELIABILITY QU, V10, P429