Scheduling in cellular manufacturing systems: an heuristic approach

被引:33
|
作者
Venkataramanaiah, S. [1 ]
机构
[1] Indian Inst Management Indore, Operat Management & Quantitat Tech Area, Indore 453331, Madhya Pradesh, India
关键词
cellular manufacturing; flowline; heuristic; missing operations; scheduling;
D O I
10.1080/00207540601138577
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Adopting cellular manufacturing, which enables achieving the goals of just-in-time (JIT) philosophy, has benefited many world-class organizations. Many approaches have been developed for the design of cellular manufacturing systems (CMS). Scheduling of parts and part families in CMS is an important issue. In this study scheduling in flowline-based CMS is addressed by considering varying degrees of missing operations for parts in a cell. A simulated annealing (SA)-based algorithm has been developed for scheduling of parts within a cell for the objective of minimization of weighted sum of makespan, flowtime and idletime. The algorithm makes use of a pool of nine popularly used dispatching rules in scheduling literature. The performance of the proposed algorithm is evaluated using an alternative algorithm with three dispatching rules, and has been proposed and evaluated for minimization of weighted sum of makespan, flowtime and idletime. The proposed algorithm was also evaluated considering two benchmark algorithms, NEH heuristic for minimization of makespan and RC heuristic for minimization of flowtime. From the limited experimental results, it is found that the performance of the proposed algorithm with a larger pool of dispatching rules performs better than the three algorithms tested. Based on the results of the study, it is also found that the operational performance of CMS depends on the percentage of missing operations and scheduling approach (such as dispatching rules) used.
引用
收藏
页码:429 / 449
页数:21
相关论文
共 50 条
  • [1] A heuristic optimisation approach for the scheduling of integrated manufacturing and distribution systems
    Ehm, Jens
    Freitag, Michael
    Frazzon, Enzo M.
    FACTORIES OF THE FUTURE IN THE DIGITAL ENVIRONMENT, 2016, 57 : 357 - 361
  • [2] Heuristic Algorithms for Fowline Cellular Manufacturing System Scheduling
    Li, Yazhi
    Zhu, Xianjun
    Xiao, Fangxiong
    PROCEEDINGS OF THE 2018 IEEE 22ND INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN ((CSCWD)), 2018, : 779 - 784
  • [3] Joint cell loading and scheduling approach to cellular manufacturing systems
    Akturk, M. Selim
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (21) : 6321 - 6341
  • [4] Hybrid heuristic for design of cellular manufacturing systems
    Venkataramanaiah, S
    Krishnaiah, K
    PRODUCTION PLANNING & CONTROL, 2002, 13 (03) : 274 - 283
  • [5] Scheduling Robotic Cellular Manufacturing Systems With Timed Petri Net, A* Search, and Admissible Heuristic Function
    Huang, Bo
    Zhou, MengChu
    Abusorrah, Abdullah
    Sedraoui, Khaled
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2022, 19 (01) : 243 - 250
  • [6] OPTIMIZATION OF COBOTS AND OPERATORS ASSIGNMENT IN CELLULAR MANUFACTURING SYSTEMS: A MATHEMATICAL MODEL AND HEURISTIC APPROACH
    Saleemuddin, S.M.
    Hudgikar, Sanjeev Reddy K.
    UPB Scientific Bulletin, Series D: Mechanical Engineering, 2023, 85 (04): : 165 - 178
  • [7] Heuristic Search for Scheduling Flexible Manufacturing Systems Using Multiple Heuristic Functions
    Huang, Bo
    Jiang, Rongxi
    Zhang, Gongxuan
    MODERN ADVANCES IN APPLIED INTELLIGENCE, IEA/AIE 2014, PT I, 2014, 8481 : 178 - 187
  • [8] New shop-based and predictive scheduling heuristic for cellular manufacturing
    Clarkson Univ, Potsdam, United States
    Int J Prod Res, 2 (313-326):
  • [9] A new shop-based and predictive scheduling heuristic for cellular manufacturing
    Mahmoodi, F
    Martin, GE
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (02) : 313 - 326
  • [10] Scheduling in flowshop and cellular manufacturing systems with multiple objectives - A genetic algorithmic approach
    Sridhar, J
    Rajendran, C
    PRODUCTION PLANNING & CONTROL, 1996, 7 (04) : 374 - 382