The extraordinary in decision-making: myth, apology or opportunity?

被引:0
作者
Maes, M. A. [1 ]
Dann, M. R. [1 ]
Caspeele, R. [2 ]
机构
[1] Univ Calgary, Dept Civil Engn, Calgary, AB, Canada
[2] Univ Ghent, Dept Struct Engn, Ghent, Belgium
关键词
Decision-making; black swans; perfect storms; unknowable unknowns; BLACK SWANS;
D O I
10.1080/23789689.2018.1469356
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Robustness, resilience and anticipation are essential aspects of a system's first line of defence against exceptional hazards and high-impact unexpected events. This paper questions both the principles and the need of digging too deep into the often intangible world of high-consequence low-probability events that have the potential to impact systems and society as a whole. The engineering community has recently taken to referring to certain events as black swans, perfect storms or events caused by a priori unknowable unknowns, as if such appellation would constitute an apology for their sudden occurrence. We show that many of these metaphoric notions are either conceptually inappropriate, mostly from an epistemic point of view; or else, that they have little operational bearing on our knowledge base and on best practice rational decision-making.The case studies illustrate their conceptual and metaphorical role in a world of interconnected networks of everything.
引用
收藏
页码:20 / 29
页数:10
相关论文
共 24 条
  • [1] [Anonymous], NTSBPAR0301
  • [2] [Anonymous], BANK FIN SERV POLICY
  • [3] [Anonymous], P S REL ENG SYST SRE
  • [4] [Anonymous], [No title captured]
  • [5] Au S.-K., 2014, ENG RISK ASSESSMENT, DOI [10.1002/9781118398050, DOI 10.1002/9781118398050]
  • [6] Implications of black swans to the foundations and practice of risk assessment and management
    Aven, Terje
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2015, 134 : 83 - 91
  • [7] Bates D.V., 1979, ROYAL COMM INQ HLTH
  • [8] Capacities of template-type platforms in the gulf of Mexico during hurricane Andrew
    Bea, RG
    Loch, KJ
    Young, PL
    [J]. JOURNAL OF OFFSHORE MECHANICS AND ARCTIC ENGINEERING-TRANSACTIONS OF THE ASME, 1997, 119 (01): : 1 - 7
  • [9] Department of Transportation, 2002, FED REGISTER, V67, P1108
  • [10] Evans D., 2012, RISK INTELLIGENCE LI, DOI [10.1007/978-94-007-1433-5, DOI 10.1007/978-94-007-1433-5]