A two-level programming method for collaborative scheduling in construction supply chain management

被引:0
|
作者
Xue, Xiaolong [1 ]
Sun, Chengshuang [1 ]
Wang, Yaowu [1 ]
Shen, Qiping [2 ]
机构
[1] Harbin Inst Technol, Sch Management, Harbin 150001, Peoples R China
[2] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Kowloon, Hong Kong, Peoples R China
来源
COOPERATIVE DESIGN, VISUALIZATION, AND ENGINEERING | 2007年 / 4674卷
关键词
collaborative scheduling; two-level programming; supply chain; construction industry;
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
There are increasing requirements for collaborative scheduling (CS) in supply chain management (SCM). CS in construction supply chain (CSC), which involves multiple partners, such as general contractor, subcontractors, and material suppliers, can be seen as a multilevel decision-making system with hierarchical structure. Adopting the decomposition-coordination thought of large scale system theory and using the multilevel programming theory, a two-level programming model for CS decision making is established to find satisfactory solution for every partner in CSC. This model has the merit of paying attention to the maximization of profit or minimization of cost of all partners located at different decision-making level in CS process. The algorithm of this model is provided, which is combined with the first level programming adopting simulated annealing algorithm and second level programming using discrete search algorithm. Finally, an illustrative example of CS in a CSC is presented. The two-level programming method provides a new way to improve collaborative decision making in CSC. This research makes a contribution to the body of knowledge of scheduling.
引用
收藏
页码:290 / +
页数:3
相关论文
共 50 条
  • [41] Research on risk management in the construction supply chain
    Xu Chengjie
    Yang Chengliang
    Li Shujuan
    PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 870 - 874
  • [42] A seamless supply chain management model for construction
    Love, PED
    Irani, Z
    Edwards, DJ
    SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2004, 9 (01) : 43 - 56
  • [43] A close inquiry on Construction Supply Chain Management
    Lu, LN
    Li, CY
    NEW TRENDS OF INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT IN NEW CENTURY, 2001, : 684 - 687
  • [44] Two-Level Bat Algorithm with Variable Neighborhood Search for Capacitated Vehicle Routing Problem in Supply Chain
    Qi Y.-H.
    Cai Y.-G.
    Cai H.
    Yang L.
    Yao Y.
    Tien Tzu Hsueh Pao/Acta Electronica Sinica, 2019, 47 (07): : 1434 - 1442
  • [45] Collaborative methods in supply chain management: implementation challenges
    Gomes, Leonardo de Carvalho
    Kliemann Neto, Francisco Jose
    RAE-REVISTA DE ADMINISTRACAO DE EMPRESAS, 2015, 55 (05): : 563 - 577
  • [46] Research on Collaborative Quality Management System into Supply Chain
    Jiang, Xingyu
    Wang, Yinchun
    Liu, Zhonghai
    Wang, Wanshan
    2009 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS ( ICAL 2009), VOLS 1-3, 2009, : 130 - +
  • [47] Two-Level Supply Chain Inventory Model for Perishable Goods with Fuzzy Lead-Time and Shortages
    Mallick R.K.
    Manna A.K.
    Shaikh A.A.
    Mondal S.K.
    International Journal of Applied and Computational Mathematics, 2021, 7 (5)
  • [48] Improving sustainability in a two-level pharmaceutical supply chain through Vendor-Managed Inventory system
    Weraikat, Dua
    Zanjani, Masoumeh Kazemi
    Lehoux, Nadia
    OPERATIONS RESEARCH FOR HEALTH CARE, 2019, 21 : 44 - 55
  • [49] Note on "Coordinating the ordering and advertising policies for a single-period commodity in a two-level supply chain"
    Giri, B. C.
    Bardhan, S.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 77 : 11 - 14
  • [50] Optimization programming tools supporting supply chain management
    Szkutnik-Rogoz, Joanna
    Malachowski, Jerzy
    BULLETIN OF THE POLISH ACADEMY OF SCIENCES-TECHNICAL SCIENCES, 2023, 71 (01)