A two-level programming method for collaborative scheduling in construction supply chain management

被引:0
|
作者
Xue, Xiaolong [1 ]
Sun, Chengshuang [1 ]
Wang, Yaowu [1 ]
Shen, Qiping [2 ]
机构
[1] Harbin Inst Technol, Sch Management, Harbin 150001, Peoples R China
[2] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Kowloon, Hong Kong, Peoples R China
来源
COOPERATIVE DESIGN, VISUALIZATION, AND ENGINEERING | 2007年 / 4674卷
关键词
collaborative scheduling; two-level programming; supply chain; construction industry;
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
There are increasing requirements for collaborative scheduling (CS) in supply chain management (SCM). CS in construction supply chain (CSC), which involves multiple partners, such as general contractor, subcontractors, and material suppliers, can be seen as a multilevel decision-making system with hierarchical structure. Adopting the decomposition-coordination thought of large scale system theory and using the multilevel programming theory, a two-level programming model for CS decision making is established to find satisfactory solution for every partner in CSC. This model has the merit of paying attention to the maximization of profit or minimization of cost of all partners located at different decision-making level in CS process. The algorithm of this model is provided, which is combined with the first level programming adopting simulated annealing algorithm and second level programming using discrete search algorithm. Finally, an illustrative example of CS in a CSC is presented. The two-level programming method provides a new way to improve collaborative decision making in CSC. This research makes a contribution to the body of knowledge of scheduling.
引用
收藏
页码:290 / +
页数:3
相关论文
共 50 条
  • [31] Qualifying the bullwhip effect in a two-level supply chain: The value of demand information sharing
    Liao, Nuo
    Xu, Xuejun
    SIXTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS 1-4: MANAGEMENT CHALLENGES IN A GLOBAL WORLD, 2007, : 494 - 501
  • [32] The Construction of Collaborative System of Military Production Supply Chain
    Wang, Lan-Yi
    2016 2ND INTERNATIONAL CONFERENCE ON MODERN EDUCATION AND SOCIAL SCIENCE (MESS 2016), 2016, : 1241 - 1248
  • [33] Understanding Construction Supply Chain Management
    Behera, Panchanan
    Mohanty, R. P.
    Prakash, Anand
    PRODUCTION PLANNING & CONTROL, 2015, 26 (16) : 1332 - 1350
  • [34] Study of collaborative management of supply chain in an IT environment
    Ding, Yanping
    JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM, 2013, 6 (04): : 1082 - 1093
  • [35] Quality Control Decision Research of Two-Level Supply Chain Based on the "ERC" Fairness Preference
    Zhao, Yongqiang
    Jing, Shaoqing
    Wang, Ruidi
    ADVANCES IN INTELLIGENT TRAFFIC AND TRANSPORTATION SYSTEMS, ICITT 2022, 2023, 34 : 148 - 157
  • [36] Production Planning Problem of a Two-Level Supply Chain with Production-Time-Dependent Products
    Han, Jun-Hee
    Lee, Ju-Yong
    Jeong, Bongjoo
    APPLIED SCIENCES-BASEL, 2021, 11 (20):
  • [37] Supply chain optimal ordering policy under two-level trade credit with default risk
    Wu, Chengfeng
    Zhao, Qiuhong
    Xu, Chunfeng
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2022, 16 (03) : 317 - 348
  • [38] A Method of Collaborative Negotiation for Supply Chain Coordination
    Wang Xiao-Gang
    Li Yue
    PROCEEDINGS OF THE 2009 PACIFIC-ASIA CONFERENCE ON CIRCUITS, COMMUNICATIONS AND SYSTEM, 2009, : 722 - 725
  • [39] Collaborative Services: A Four-Level Model for Supply Chain Management with Big Data Technology
    Lu, Yanxia
    Chen, Tingbin
    Zhao, Jiacong
    Wang, Jingshu
    PROCEEDINGS OF THE 2017 7TH INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT, COMPUTER AND SOCIETY (EMCS 2017), 2017, 61 : 586 - 592
  • [40] Exploring change in construction: supply chain management
    Fernie, Scott
    Thorpe, Anthony
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2007, 14 (04) : 319 - +