A two-level programming method for collaborative scheduling in construction supply chain management

被引:0
|
作者
Xue, Xiaolong [1 ]
Sun, Chengshuang [1 ]
Wang, Yaowu [1 ]
Shen, Qiping [2 ]
机构
[1] Harbin Inst Technol, Sch Management, Harbin 150001, Peoples R China
[2] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Kowloon, Hong Kong, Peoples R China
来源
COOPERATIVE DESIGN, VISUALIZATION, AND ENGINEERING | 2007年 / 4674卷
关键词
collaborative scheduling; two-level programming; supply chain; construction industry;
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
There are increasing requirements for collaborative scheduling (CS) in supply chain management (SCM). CS in construction supply chain (CSC), which involves multiple partners, such as general contractor, subcontractors, and material suppliers, can be seen as a multilevel decision-making system with hierarchical structure. Adopting the decomposition-coordination thought of large scale system theory and using the multilevel programming theory, a two-level programming model for CS decision making is established to find satisfactory solution for every partner in CSC. This model has the merit of paying attention to the maximization of profit or minimization of cost of all partners located at different decision-making level in CS process. The algorithm of this model is provided, which is combined with the first level programming adopting simulated annealing algorithm and second level programming using discrete search algorithm. Finally, an illustrative example of CS in a CSC is presented. The two-level programming method provides a new way to improve collaborative decision making in CSC. This research makes a contribution to the body of knowledge of scheduling.
引用
收藏
页码:290 / +
页数:3
相关论文
共 50 条
  • [21] Vendor-managed inventory and bullwhip reduction in a two-level supply chain
    Disney, SM
    Towill, DR
    INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2003, 23 (5-6) : 625 - 651
  • [22] Economic order quantity in a centralized two-level supply chain with transportation cost
    Baboli, Armand
    Pirayesh Neghab, Mohammadali
    Haji, Rasoul
    2006 INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2006, : 240 - 245
  • [23] Joint production and delivery scheduling in two-level supply chains: A distributed agent approach
    Wan, GH
    2004 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN & CYBERNETICS, VOLS 1-7, 2004, : 1522 - 1526
  • [24] SUPPLY CHAIN MANAGEMENT IN THE UAE CONSTRUCTION INDUSTRY
    Albaloushi, Helal
    Skitmore, Martin
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2008, 8 (01) : 53 - 71
  • [25] The two-level harmonization model of tour supply chain based on Bayesian Game Theory
    Tian, Wenqiang
    Jin, Maozhu
    Yang, Xin
    Gao, Huafeng
    INFORMATION SCIENCE AND MANAGEMENT ENGINEERING, VOLS 1-3, 2014, 46 : 2295 - 2301
  • [26] MODELING (r, Q) POLICY IN A TWO-LEVEL SUPPLY CHAIN SYSTEM WITH FUZZY DEMAND
    Pirayesh, Mohammadali
    Yazdi, Mohammad Modarres
    INTERNATIONAL JOURNAL OF UNCERTAINTY FUZZINESS AND KNOWLEDGE-BASED SYSTEMS, 2010, 18 (06) : 819 - 841
  • [27] Consignment stock policy with unequal shipments and process unreliability for a two-level supply chain
    Giri, B. C.
    Chakraborty, A.
    Maiti, T.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (09) : 2489 - 2505
  • [28] Stackelberg models in a two-level supply chain with imperfect quality items and allowable shortage
    Yadav, R.
    Pareek, S.
    Mittal, M.
    SCIENTIA IRANICA, 2023, 30 (02) : 642 - 659
  • [29] Modelling the benefits of information sharing-based partnerships in a two-level supply chain
    Yu, Z
    Yan, H
    Cheng, TCE
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2002, 53 (04) : 436 - 446
  • [30] Coordination of cooperative advertising in a two-level supply chain when manufacturer offers discount
    Yue, JF
    Austin, J
    Wang, MC
    Huang, ZM
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 168 (01) : 65 - 85