Scheduling of head-dependent cascaded reservoirs considering discharge ramping constraints and start/stop of units

被引:37
作者
Catalao, J. P. S. [1 ]
Pousinho, H. M. I. [1 ]
Mendes, V. M. F. [2 ]
机构
[1] Univ Beira Interior, Dept Electromech Engn, P-6201001 R Fonte Do Lameiro, Covilha, Portugal
[2] Inst Super Engn Lisboa, Dept Elect Engn & Automat, P-1950062 Lisbon, Portugal
关键词
Short-term hydro scheduling (STHS); Electricity market; Head dependence; Mixed-integer nonlinear programming (MINLP); PARTICLE SWARM OPTIMIZATION; POWER-GENERATION; NETWORK FLOW; HYDRO-CHAIN; SYSTEMS; COMMITMENT; ALGORITHM; MODEL;
D O I
10.1016/j.ijepes.2010.01.022
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning head-dependent reservoirs under competitive environment. We propose a novel method, based on mixed-integer nonlinear programming (MINLP), for optimising power generation efficiency. This method considers hydroelectric power generation as a nonlinear function of water discharge and of the head. The main contribution of this paper is that discharge ramping constraints and start/stop of units are also considered, in order to obtain more realistic and feasible results. The proposed method has been applied successfully to solve two case studies based on Portuguese cascaded hydro systems, providing a higher profit at an acceptable computation time in comparison with classical optimisation methods based on mixed-integer linear programming (MILP). (C) 2010 Elsevier Ltd. All rights reserved.
引用
收藏
页码:904 / 910
页数:7
相关论文
共 47 条
[11]   Day-ahead electricity price forecasting using the wavelet transform and ARIMA models [J].
Conejo, AJ ;
Plazas, MA ;
Espínola, R ;
Molina, AB .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (02) :1035-1042
[12]   Self-scheduling of a hydro producer in a pool-based electricity market [J].
Conejo, AJ ;
Arroyo, JM ;
Contreras, J ;
Villamor, FA .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2002, 17 (04) :1265-1272
[13]   ARIMA models to predict next-day electricity prices [J].
Contreras, J ;
Espínola, R ;
Nogales, FJ ;
Conejo, AJ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2003, 18 (03) :1014-1020
[14]   Enhanced merit order and augmented Lagrange Hopfield network for hydrothermal scheduling [J].
Dieu, Vo Ngoc ;
Ongsakul, Weerakorn .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2008, 30 (02) :93-101
[15]   A four-dimensional model of hydro generation for the short-term hydrothermal dispatch problem considering head and spillage effects [J].
Diniz, Andre Luiz ;
Pineiro Maceira, Maria Elvira .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2008, 23 (03) :1298-1308
[16]   SHORT-TERM RESOURCE SCHEDULING IN MULTI-AREA HYDROTHERMAL POWER-SYSTEMS [J].
FERREIRA, LAFM ;
ANDERSSON, T ;
IMPARATO, CF ;
MILLER, TE ;
PANG, CK ;
SVOBODA, A ;
VOJDANI, AF .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1989, 11 (03) :200-212
[17]   Solving the hydro unit commitment problem via dual decomposition and sequential quadratic programming [J].
Finardi, EC ;
da Silva, EL .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2006, 21 (02) :835-844
[18]   Short-term hydropower production planning by stochastic programming [J].
Fleten, Stein-Erik ;
Kristoffersen, Trine Krogh .
COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (08) :2656-2671
[19]   Generation scheduling in a deregulated system. The Norwegian case - Discussion [J].
Fotuhi-Firuzabad, M ;
Billinton, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (01) :81-81
[20]   Risk-averse profit-based optimal scheduling of a hydro-chain in the day-ahead electricity market [J].
Garcia-Gonzalez, Javier ;
Parrilla, Ernesto ;
Mateo, Alicia .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 181 (03) :1354-1369