The Risk Evaluation of the Engineering Change Based on the Set Pair Analysis Technology

被引:2
作者
Jin Lianghai [1 ]
Hao Sheng [1 ]
Xie Huiyun [1 ]
Xue Xiaofei [1 ]
机构
[1] China Three Gorges Univ, Yichang 443002, Hubei, Peoples R China
来源
2014 SIXTH INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION (ICMTMA) | 2014年
关键词
Engineering Change; Set Pair Analysis; Risk Evaluation; Uncertainty;
D O I
10.1109/ICMTMA.2014.186
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Engineering change is an important part of the construction project contract management and a critical factor of the three controls in construction project. As there are many engineering changes at the implementation stage of the project, many construction projects occur "final accounts over budget; budget over budgetary estimate; budgetary estimate over estimate" and construction period delay. Engineering change risk has the three characteristics of random uncertainty, fuzzy uncertainty, and grey uncertainty. Based on the Set Pair Analysis theory (SPA), risk systems with multiple uncertainties are carried out by dialectical and quantitative analysis. Evaluating engineering change risk from both sides and global perspective, we find out the critical factor of engineering change. Taking a real estate development project for example, using SPA model into risk analysis, the paper reveals that the key factor of engineering change for the project is designer quality, and provides theoretical basis for engineering change management.
引用
收藏
页码:757 / 761
页数:5
相关论文
共 50 条
  • [1] Information Risk Evaluation and Application: Based on Set Pair Analysis
    Zhao, Jinlou
    Gao, Hongyu
    Cheng, Junhui
    2014 SEVENTH INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION (CSO), 2014, : 312 - 315
  • [2] Information Risk Evaluation and Application: Based on the Set Pair Analysis
    Gao, Hongyu
    PROCEEDINGS OF THE FIFTH INTERNATIONAL FORUM ON DECISION SCIENCES, 2018, : 285 - 294
  • [3] Risk evaluation method based on set pair analysis applied to overseas mining investment
    Ma, Zhaoyang
    Li, Guoqing
    Hu, Nailian
    Liu, Di
    GOSPODARKA SUROWCAMI MINERALNYMI-MINERAL RESOURCES MANAGEMENT, 2018, 34 (04): : 145 - 164
  • [4] Fuzzy Comprehensive Evaluation on the Projects Risk Based Set Pair Analysis
    Li, Gaoyang
    MECHATRONICS AND INTELLIGENT MATERIALS II, PTS 1-6, 2012, 490-495 : 1221 - 1225
  • [5] The evaluation model of international science and technology cooperation based on set pair analysis
    Liu, Chunfeng
    Zhang, Ling
    Yang, Aimin
    Zhao, Shujing
    Li, Dan
    JOURNAL OF INTERDISCIPLINARY MATHEMATICS, 2014, 17 (01) : 95 - 108
  • [6] The Financial Risk Evaluation of Non-Life Insurance Company Based on Set Pair Analysis
    Deng, Qingbiao
    Pu, Zijia
    CONFERENCE ON WEB BASED BUSINESS MANAGEMENT, VOLS 1-2, 2010, : 810 - 813
  • [7] Risk state evaluation of aviation maintenance based on multiple connection number set pair analysis
    Shi Z.-J.
    Wang H.-W.
    Wang X.
    Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2016, 38 (03): : 588 - 594
  • [8] Set Pair Analysis Model Based on GIS to Evaluation for Flood Damage Risk
    Wang Zhaoli
    Ma Hongliang
    Lai Chengguang
    Song Haijuan
    2012 INTERNATIONAL CONFERENCE ON MODERN HYDRAULIC ENGINEERING, 2012, 28 : 196 - 201
  • [9] Unascertained Measure-Set Pair Analysis Model of Collapse Risk Evaluation in Mountain Tunnels and Its Engineering Application
    Wu Chen
    Guohua Zhang
    Yuyong Jiao
    Hao Wang
    KSCE Journal of Civil Engineering, 2021, 25 : 451 - 467
  • [10] Unascertained Measure-Set Pair Analysis Model of Collapse Risk Evaluation in Mountain Tunnels and Its Engineering Application
    Chen, Wu
    Zhang, Guohua
    Jiao, Yuyong
    Wang, Hao
    KSCE JOURNAL OF CIVIL ENGINEERING, 2021, 25 (02) : 451 - 467