SCP-Matrix based shipyard APS design: Application to long-term production plan

被引:24
作者
Nam, SeungHoon [1 ]
Shen, HuiQiang [1 ]
Ryu, Cheolho [2 ]
Shin, Jong Gye [1 ,3 ]
机构
[1] Seoul Natl Univ, Dept Naval Architecture & Ocean Engn, 1 Gwanak Ro, Seoul, South Korea
[2] Inha Tech Coll, Dept Naval Architecture & Ocean Engn, 100 Inha Ro, Incheon, South Korea
[3] Seoul Natl Univ, Res Inst Marine Syst Engn, 1 Gwanak Ro, Seoul, South Korea
关键词
Advanced Planning System (APS); Supply Chain Planning Matrix (SCP-Matrix); Engineer To Order (ETO); Shipbuilding production plan; System development; SUPPLY CHAIN MANAGEMENT; SYSTEMS; CHALLENGES; ENGINEER; SUPPORT;
D O I
10.1016/j.ijnaoe.2017.10.003
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
A shipyard is an Engineer To Order (ETO) company that designs and manufactures new products when orders are placed. Various tasks are concurrently performed, thereby making process management considerably important. It is particularly important to plan and control production activities because production constitutes the largest part of the overall process. Therefore, this study focuses on the development of a production planning system based on an Advanced Planning System (APS). An APS is an integrated planning system that targets supply chain processes in accordance with the principles of hierarchical planning. In this study, a Supply Chain Planning Matrix (SCP-Matrix), which is used as a guideline for APS development, is designed through analysis of shipyard cases. Then, we define the process in detail, starting from long-term production plan as the initial application, and design and implement a long-term production planning system using a component-based development. (C) 2017 Society of Naval Architects of Korea. Production and hosting by Elsevier B.V. This is an open access article under the CC BY-NC-ND license
引用
收藏
页码:741 / 761
页数:21
相关论文
共 37 条
[1]   Engineer-to-order (ETO) production planning and control: an empirical framework for machinery-building companies [J].
Adrodegari, Federico ;
Bacchetti, Andrea ;
Pinto, Roberto ;
Pirola, Fabiana ;
Zanardini, Massimo .
PRODUCTION PLANNING & CONTROL, 2015, 26 (11) :910-932
[2]  
[Anonymous], HDB OPERATIONS RES M
[3]   A study for production simulation model generation system based on data model at a shipyard [J].
Back, Myung-Gi ;
Lee, Dong-Kun ;
Shin, Jong-Gye ;
Woo, Jong-Hoon .
INTERNATIONAL JOURNAL OF NAVAL ARCHITECTURE AND OCEAN ENGINEERING, 2016, 8 (05) :496-510
[4]  
Cho KK, 1998, CIRP ANNALS 1998 - MANUFACTURING TECHNOLOGY, VOL 47, NO 1, V47, P419
[5]   Shop-floor scheduling at shipbuilding yards using the multiple intelligent agent system [J].
Choi, HS ;
Park, KH .
JOURNAL OF INTELLIGENT MANUFACTURING, 1997, 8 (06) :505-515
[6]  
Ennis K.J., 1998, J SHIP PROD, V14, P41
[7]  
Fast K.R, 2000, DTIC DOCUMENT
[8]  
Fleischer Mitchell., 1999, Journal of Ship Production, V15, P233
[9]  
Fleischmann B., 2008, Supply chain management and advanced planning. Concepts, models, software, V4, P81, DOI DOI 10.1007/978-3-540-74512-95
[10]   Principles for the design and operation of engineer-to-order supply chains in the construction sector [J].
Gosling, Jonathan ;
Towill, Denis R. ;
Naim, Mohamed M. ;
Dainty, Andrew R. J. .
PRODUCTION PLANNING & CONTROL, 2015, 26 (03) :203-218