Scheduling tasks on a flexible manufacturing machine to minimize tool change delays

被引:16
作者
Ecker, KH
Gupta, JND
机构
[1] Tech Univ Clausthal, Inst Informat, D-38678 Clausthal Zellerfeld, Germany
[2] Univ Alabama, Dept Accounting & Informat Syst, Huntsville, AL 35899 USA
关键词
flexible manufacturing systems; scheduling; tool changes; precedence constraints;
D O I
10.1016/j.ejor.2003.12.025
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper considers the problem of scheduling a given set of precedence constraint tasks on a flexible machine equipped with a tool magazine where each task requires exactly one of the tools during its execution. Changing from on tool to another requires a certain amount of time that depends on the pair of tools being exchanged. We present a new algorithmic approach for general task precedence relations when it is desired to sequence the tasks in such a way that the total time required for tool changes is minimized. The proposed algorithm is of polynomial time complexity in case of task precedences of limited width w, i.e. for precedence relations where each subset of independent tasks has not more than w elements. Since the task precedences width w could be arbitrary, we describe two heuristic algorithms and empirically evaluate their effectiveness in finding schedules with minimum total time required for tool changes. (C) 2004 Elsevier B.V. All rights reserved.
引用
收藏
页码:627 / 638
页数:12
相关论文
共 24 条
[1]   Tool handling and scheduling in a two-machine flexible manufacturing cell [J].
Agnetis, A ;
Dror, M ;
Vakharia, AJ ;
Rossi, F .
IIE TRANSACTIONS, 1996, 28 (05) :425-437
[2]   THE CUTTING PATH AND TOOL SELECTION PROBLEM IN COMPUTER-AIDED PROCESS PLANNING [J].
BARD, JF ;
FEO, TA .
JOURNAL OF MANUFACTURING SYSTEMS, 1989, 8 (01) :17-26
[3]   A HEURISTIC FOR MINIMIZING THE NUMBER OF TOOL SWITCHES ON A FLEXIBLE MACHINE [J].
BARD, JF .
IIE TRANSACTIONS, 1988, 20 (04) :382-391
[4]  
Blaewicz J., 2001, Scheduling computer and manufactoring processes
[5]   NEW TRENDS IN MACHINE SCHEDULING [J].
BLAZEWICZ, J ;
FINKE, G ;
HAUPT, R ;
SCHMIDT, G .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1988, 37 (03) :303-317
[6]  
Chein M, 1980, ANN DISCRETE MATH, V9, P189
[7]  
Chen B, 1998, Handbook of combinatorial optimization, P1493, DOI [DOI 10.1007/978-1-4613-0303-9_25, 10.1007/978-1-4613-0303-9_25]
[8]  
COLBURN CJ, 1984, ORDER, V1, P225
[9]  
Crama Y., 1994, International Journal of Flexible Manufacturing Systems, V6, P33, DOI 10.1007/BF01324874
[10]   Scheduling of resource tasks [J].
Ecker, KH .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 115 (02) :314-327