Discrete particle swarm optimisation combined with no-wait algorithm in stages for scheduling mill roller annealing process

被引:5
|
作者
Tang, Jiafu [1 ]
Song, Jiwei [1 ]
机构
[1] Northeastern Univ NEU, Dept Syst Engn, Key Lab Integrated Automat Proc Ind, Shenyang 110004, Liaoning, Peoples R China
基金
中国国家自然科学基金;
关键词
mill roll annealing process; no-wait hybrid flow shop; discrete particle swarm optimisation; no-wait algorithm in stages; HYBRID FLOW-SHOP; 2-STAGE; TIME;
D O I
10.1080/0951192X.2010.506655
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, a mill roll annealing operation scheduling problem is investigated against the background of a cast steel plant of Machinery Mill Roll Co., Ltd in mainland China. During the annealing processes, a roller needs to be processed in multistage process with different types of furnaces and there is no waiting between the stages. Based on the analysis of the feature of the mill roll annealing process, this problem can be formulated as a no-wait hybrid flow shop scheduling problem, of which the 'job' is a batch of rough roll, and the 'machine' is a heating furnace. As each batch will be of different sizes, the jobs will have different sizes and processing times. According to the no-wait characteristic between two sequential operations of a job, the no-wait algorithm in stages is designed to obtain the initial solution. Combined with the no-wait algorithm in stages, a discrete particle swarm optimisation algorithm has been developed to solve the integer programming model. In the simulation experiment with real data, the applicability and the effectiveness of algorithms are demonstrated by the comparisons and the analysis of the experiment results, and the equipment reformation strategies of the actual reference value are given as well which is beneficial for the policy-maker to arrange production reasonably. Furthermore, some large-scale instances about the no-wait hybrid flow shop scheduling problem are studied effectively.
引用
收藏
页码:979 / 991
页数:13
相关论文
共 50 条
  • [1] A discrete particle swarm optimization algorithm for the no-wait flowshop scheduling problem
    Pan, Quan-Ke
    Tasgetiren, M. Fatih
    Liang, Yun-Chia
    COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (09) : 2807 - 2839
  • [2] Scheduling Model and Discrete Particle Swarm Optimization Algorithm for Roller Annealing
    Song, Jiwei
    Tang, Jiafu
    7TH INTERNATIONAL CONFERENCE ON SYSTEM SIMULATION AND SCIENTIFIC COMPUTING ASIA SIMULATION CONFERENCE 2008, VOLS 1-3, 2008, : 770 - 775
  • [3] A hybrid discrete particle swarm optimization algorithm for the no-wait flow shop scheduling problem with makespan criterion
    Quan-Ke Pan
    Ling Wang
    M. Fatih Tasgetiren
    Bao-Hua Zhao
    The International Journal of Advanced Manufacturing Technology, 2008, 38 : 337 - 347
  • [4] A hybrid discrete particle swarm optimization algorithm for the no-wait flow shop scheduling problem with makespan criterion
    Pan, Quan-Ke
    Wang, Ling
    Tasgetiren, M. Fatih
    Zhao, Bao-Hua
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 38 (3-4): : 337 - 347
  • [5] Discrete Particle Swarm Optimization Algorithm for Lot-streaming No-wait Flow Shop Scheduling Problem
    Yang, Lin
    Pan, Yuxia
    MATERIALS PROCESSING TECHNOLOGY II, PTS 1-4, 2012, 538-541 : 863 - +
  • [6] A hybrid discrete particle swarm optimization algorithm for the no-wait flow shop scheduling problem with makespan criterion
    Pan, Quan-Ke
    Wang, Ling
    Tasgetiren, M. Fatih
    Zhao, Bao-Hua
    1600, Springer London (38): : 3 - 4
  • [7] An effective hybrid particle swarm optimization for no-wait flow shop scheduling
    Liu, Bo
    Wang, Ling
    Jin, Yi-Hui
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 31 (9-10): : 1001 - 1011
  • [8] An effective hybrid particle swarm optimization for no-wait flow shop scheduling
    Bo Liu
    Ling Wang
    Yi-Hui Jin
    The International Journal of Advanced Manufacturing Technology, 2007, 31 : 1001 - 1011
  • [9] An effective hybrid particle swarm optimization for no-wait flow shop scheduling
    Liu, Bo
    Wang, Ling
    Jin, Yi-Hui
    International Journal of Advanced Manufacturing Technology, 2007, 31 (9-10): : 1001 - 1011
  • [10] A particle swarm optimisation for the no-wait flow shop problem with due date constraints
    Samarghandi, Hamed
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (09) : 2853 - 2870