Establishing IPR in Gas-Condensate Reservoir: An Alternative Approach

被引:0
作者
Chachar, Muhammad Hanif [1 ]
Jokhio, Sarfraz Ahmed [1 ]
Tunio, Abdul Haque [1 ]
Qureshi, Haris Ahmed [1 ]
机构
[1] Mehran Univ Engn & Technol, Inst Petr & Nat Gas Engn, Jamshoro, Pakistan
关键词
gas; condensate; condensate reservoir; Pseudopressure; Well productivity; Relative Permeability; Permeability; IPR; PERFORMANCE;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Inflow performance relationship (IPR) accuracy in the condensate reservoir is a long-standing problem in the oil industry. This paper presents a new approach to project the gas phase IPR in condensate reservoirs. IPR is estimated by Rawlins and Schellhardt equation whereas the gas pseudo-pressure function is solved by two methods and the results are compared. Both two pseudo-pressure equations are used to estimate IPR. Additionally, an average of both IPR's is estimated and compared. At the reservoir pressure, the difference between both flow rates is negligible i.e. at 6750 psi, the flow rate difference is 0.55 MMSCF/D. As pressure declines the difference is increasing at one stage, it is observed approximately 15 MMSCF/D.
引用
收藏
页码:5011 / 5015
页数:5
相关论文
共 16 条
[1]  
Abdallah M. S., 2017, SPE KINGD SAUD AR AN
[2]  
Al-Hussainy R., 1966, J. Petroleum Technol., P237, DOI [DOI 10.2118/1243-APA, DOI 10.2118/1243-A-PA]
[3]  
[Anonymous], 2000, SPE ANN TECHN C EXH
[4]  
[Anonymous], 1994, SPE AS PAC OIL GAS C
[5]  
Chachar M. H., 2018, ENG SCI TECHNOLOGY I, V2, P95
[6]   Calculation of theoretical productivity factor [J].
Evinger, HH ;
Muskat, M .
TRANSACTIONS OF THE AMERICAN INSTITUTE OF MINING AND METALLURGICAL ENGINEERS, 1942, 146 :126-138
[7]   Modeling gas-condensate well deliverability [J].
Fevang, O ;
Whitson, CH .
SPE RESERVOIR ENGINEERING, 1996, 11 (04) :221-230
[8]  
Gherson P., 2000, SPE ANN TECHN C EXH
[9]  
Gopal V. N., 1977, OIL GAS J, V75, P8
[10]  
Jokhio S. A., 2002, SPE GAS TECHN S CALG