Multi-objective genetic algorithm for integrated process planning and scheduling with fuzzy processing time

被引:0
作者
Wen, Xiaoyu [1 ]
Li, Xinyu [1 ]
Gao, Liang [1 ]
Wan, Liang [1 ]
Wang, Wenwen [1 ]
机构
[1] Huazhong Univ Sci & Technol, State Key Lab Digital Mfg Equipment & Technol, Wuhan 430074, Peoples R China
来源
2013 SIXTH INTERNATIONAL CONFERENCE ON ADVANCED COMPUTATIONAL INTELLIGENCE (ICACI) | 2013年
关键词
Integrated process planning and scheduling; multi-objective genetic algorithm; fuzzy processing time;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Integrated process planning and scheduling is a significant research focus in recent years, which could improve the performance of manufacturing system. In real manufacturing environment, multi-objectives should be taken into consideration simultaneously during the machining process. Meanwhile, the processing time for each job is often imprecise in many real applications. Therefore, multi-objective integrated process planning and scheduling (IPPS) problem with fuzzy processing time is addressed in this paper. The processing time is described as triangular fuzzy number. A multi-objective genetic algorithm (MOGA) is designed to search for the Pareto solutions of multiobjective IPPS problem with fuzzy processing time. An instance has been designed to test the performance of proposed algorithm. The experiment result shows that the proposed MOGA could obtain satisfactory Pareto solutions for the multi-objective IPPS problem with fuzzy processing time.
引用
收藏
页码:293 / 298
页数:6
相关论文
共 14 条
[1]   A grammatical optimization approach for integrated process planning and scheduling [J].
Baykasoglu, Adil ;
Ozbakir, Lale .
JOURNAL OF INTELLIGENT MANUFACTURING, 2009, 20 (02) :211-221
[2]  
Cui XX, 2001, IEEE C EVOL COMPUTAT, P1316, DOI 10.1109/CEC.2001.934343
[3]   A fast and elitist multiobjective genetic algorithm: NSGA-II [J].
Deb, K ;
Pratap, A ;
Agarwal, S ;
Meyarivan, T .
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (02) :182-197
[4]  
FANG HL, 1993, PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON GENETIC ALGORITHMS, P375
[5]   Applications of particle swarm optimisation in integrated process planning and scheduling [J].
Guo, Y. W. ;
Li, W. D. ;
Mileham, A. R. ;
Owen, G. W. .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2009, 25 (02) :280-288
[6]   Integration of scheduling with computer aided process planning [J].
Kumar, M ;
Rajotia, S .
JOURNAL OF MATERIALS PROCESSING TECHNOLOGY, 2003, 138 (1-3) :297-300
[7]  
Li X., INT J ADV MANUF TECH, DOI [10. 1007 / sOO l70- 012- 4572- 7, DOI 10.1007/S00170012-4572-7]
[8]   Application of game theory based hybrid algorithm for multi-objective integrated process planning and scheduling [J].
Li, Xinyu ;
Gao, Liang ;
Li, Weidong .
EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (01) :288-297
[9]   A multi-objective optimisation model to integrating flexible process planning and scheduling based on hybrid multi-objective simulated annealing [J].
Mohammadi, Ghorbanali ;
Karampourhaghghi, Ali ;
Samaei, Farshid .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (18) :5063-5076
[10]  
Rajkumar M., 2010, International Journal of Manufacturing Research, V5, P230, DOI 10.1504/IJMR.2010.031633