A simulated annealing with multiple-search paths and parallel computation for a comprehensive flowshop scheduling problem

被引:14
作者
Defersha, Fantahun M. [1 ]
机构
[1] Univ Guelph, Sch Engn, Guelph, ON N1G 2W1, Canada
关键词
hybrid flexible flowshop; lot streaming; simulated annealing; multiple-search paths; parallel computation; GENETIC ALGORITHM; VARIABLE SUBLOTS; SETUP TIMES; SINGLE-JOB; LOT; SHOP; 2-MACHINE; MINIMIZE; CONVERGENCE;
D O I
10.1111/itor.12105
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Recent studies have demonstrated that the performance of a simulated annealing algorithm can be improved by following multiple-search paths and parallel computation. In this paper, we use these strategies to solve a comprehensive mathematical model for a flexible flowshop lot streaming problem. In the flexible flowshop environment, a number of jobs will be processed in several consecutive production stages, and each stage may involve a certain number of parallel machines that may not be identical. Each job has to be split into several unequal sublots by following the concept of lot streaming. The sublots are to be processed in the order of the stages, and sublots of certain products may skip some stages. This complex problem also incorporates sequence-dependent setup times, the anticipatory or nonanticipatory nature of setups, release dates for machines, and machine eligibility. Numerical examples are presented to demonstrate the effectiveness of lot streaming in hybrid flowshops, the performance of the proposed simulated annealing algorithm, and the improvements achieved using parallel computation.
引用
收藏
页码:669 / 691
页数:23
相关论文
共 49 条
[1]  
Azencott R., 1992, Simulated annealing: Parallelization techniques, P1
[2]  
Azencott R., 1992, SIMULATED ANNEALING, P25
[3]   Adaptive temperature control for simulated annealing: a comparative study [J].
Azizi, N ;
Zolfaghari, S .
COMPUTERS & OPERATIONS RESEARCH, 2004, 31 (14) :2439-2451
[4]   A COMPARATIVE-STUDY OF LOT STREAMING PROCEDURES [J].
BAKER, KR ;
JIA, D .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1993, 21 (05) :561-566
[5]   LOT STREAMING IN THE 2-MACHINE FLOW-SHOP WITH SETUP TIMES [J].
BAKER, KR .
ANNALS OF OPERATIONS RESEARCH, 1995, 57 :1-11
[6]   A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation [J].
Bertel, S ;
Billaut, JC .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 159 (03) :651-662
[7]  
Biskup D, 2006, J OPER RES SOC, V57, P296, DOI 10.1057/palgrave.jors.26020l6
[8]  
Blackburn J.D., 1991, Time-Based Competition
[9]  
Bockerstette J.A., 1993, TIME BASED MANUFACTU
[10]   Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness [J].
Botta-Genoulaz, V .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2000, 64 (1-3) :101-111