Evaluating the elements of just in time (JIT) for implementation in maintenance by exploratory and confirmatory factor analysis

被引:11
作者
Phogat, Sandeep [1 ]
Gupta, Anil Kumar [2 ]
机构
[1] Amity Univ, Dept Mech Engn, Gurgaon, India
[2] Deenbandhu Chhotu Ram Univ Sci & Technol, Dept Mech Engn, Murthal, India
关键词
Maintenance; Structural equation modelling (SEM); Just in time (JIT); Confirmatory factor analysis (CFA); Exploratory factor analysis (EFA); Just in time in maintenance; FIT INDEXES; SAMPLE-SIZE; MODEL-SPECIFICATION; POWER ANALYSIS; CUTOFF VALUES; PERFORMANCE; NUMBER; TPM; GFI;
D O I
10.1108/IJQRM-12-2017-0279
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose The purpose of this paper is to propose a model (structural equation modeling (SEM)) from the 16 identified just in time (JIT) elements useful for implementation of JIT in maintenance. Design/methodology/approach Data were collected using questionnaires posted to 421 manufacturing industries and automotive service industries in India from which 133 usable responses were obtained. First, exploratory factor analysis (EFA) is carried out to identify the factor structure after that confirmatory factor analysis (CFA) is carried out to verify the factor structure of a set of identified JIT elements. CFA is conceded by an SEM statistical technique. In this paper, EFA is applied to extract the factors in JIT implementation by the statistical package for social sciences (SPSS 24) software and confirming these factors by CFA through analysis of moment structures (AMOS 18) software. Findings Out of 18 identified JIT elements through literature and expert opinion only 16 JIT elements are selected for the study, two JIT elements removed due to the low value of correlation item-total correlation (CITC). Three factors extracted through EFA, which affects the benefits of JIT implementation in maintenance in quality improvement, production improvement and process control. SEM using AMOS 18.0 was used to perform the first-order three-factor structure (quality improvement, production improvement and process control) of the JIT implementation in maintenance. Originality/value The results will be useful for maintenance managers and maintenance professionals to understand the process of implementation of JIT in maintenance and to gain benefits after the implementation of JIT in maintenance in their respective organization.
引用
收藏
页码:7 / 24
页数:18
相关论文
共 44 条
[41]   Exploratory structural equation modeling, bifactor models, and standard confirmatory factor analysis models: Application to the BASC-2 Behavioral and Emotional Screening System Teacher Form [J].
Wiesner, Margit ;
Schanding, G. Thomas .
JOURNAL OF SCHOOL PSYCHOLOGY, 2013, 51 (06) :751-763
[42]   Evaluating the uses of the total score and the domain scores in the Cognitive Abilities Screening Instrument, Chinese Version (CASI C-2.0): results of confirmatory factor analysis [J].
Tsai, Rung-Ching ;
Lin, Ker-Neng ;
Wang, Hsiao-Jyuan ;
Liu, Hsiu-Chih .
INTERNATIONAL PSYCHOGERIATRICS, 2007, 19 (06) :1051-1063
[43]   Critical factors for successful implementation of just-in-time concept in modular integrated construction: A systematic review and meta-analysis [J].
Hussein, Mohamed ;
Zayed, Tarek .
JOURNAL OF CLEANER PRODUCTION, 2021, 284
[44]   Relative Effects of Demographic, Psychological, Behavioral, and Social Factors on the Initiation and Maintenance of Leisure-time Physical Activity: Results From a Confirmatory Path Analysis in a Longitudinal Study [J].
Choi, Jaesung ;
Park, JooYong ;
Kim, Ji-Eun ;
Lee, Jong-Koo ;
Kang, Daehee ;
Lee, Miyoung ;
Chung, Ick-Joong ;
Choi, Ji-Yeob .
JOURNAL OF EPIDEMIOLOGY, 2021, 31 (11) :557-565