Evaluating the elements of just in time (JIT) for implementation in maintenance by exploratory and confirmatory factor analysis

被引:11
|
作者
Phogat, Sandeep [1 ]
Gupta, Anil Kumar [2 ]
机构
[1] Amity Univ, Dept Mech Engn, Gurgaon, India
[2] Deenbandhu Chhotu Ram Univ Sci & Technol, Dept Mech Engn, Murthal, India
关键词
Maintenance; Structural equation modelling (SEM); Just in time (JIT); Confirmatory factor analysis (CFA); Exploratory factor analysis (EFA); Just in time in maintenance; FIT INDEXES; SAMPLE-SIZE; MODEL-SPECIFICATION; POWER ANALYSIS; CUTOFF VALUES; PERFORMANCE; NUMBER; TPM; GFI;
D O I
10.1108/IJQRM-12-2017-0279
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose The purpose of this paper is to propose a model (structural equation modeling (SEM)) from the 16 identified just in time (JIT) elements useful for implementation of JIT in maintenance. Design/methodology/approach Data were collected using questionnaires posted to 421 manufacturing industries and automotive service industries in India from which 133 usable responses were obtained. First, exploratory factor analysis (EFA) is carried out to identify the factor structure after that confirmatory factor analysis (CFA) is carried out to verify the factor structure of a set of identified JIT elements. CFA is conceded by an SEM statistical technique. In this paper, EFA is applied to extract the factors in JIT implementation by the statistical package for social sciences (SPSS 24) software and confirming these factors by CFA through analysis of moment structures (AMOS 18) software. Findings Out of 18 identified JIT elements through literature and expert opinion only 16 JIT elements are selected for the study, two JIT elements removed due to the low value of correlation item-total correlation (CITC). Three factors extracted through EFA, which affects the benefits of JIT implementation in maintenance in quality improvement, production improvement and process control. SEM using AMOS 18.0 was used to perform the first-order three-factor structure (quality improvement, production improvement and process control) of the JIT implementation in maintenance. Originality/value The results will be useful for maintenance managers and maintenance professionals to understand the process of implementation of JIT in maintenance and to gain benefits after the implementation of JIT in maintenance in their respective organization.
引用
收藏
页码:7 / 24
页数:18
相关论文
共 44 条
  • [11] Confirmatory Factor Analysis of a Questionnaire for Evaluating Online Training in the Workplace
    Rodriguez-Santero, Javier
    Torres-Gordillo, Juan Jesus
    Gil-Flores, Javier
    SUSTAINABILITY, 2020, 12 (11)
  • [12] The Purpose and Practice of Exploratory and Confirmatory Factor Analysis in Psychological Research: Decisions for Scale Development and Validation
    Flora, David B.
    Flake, Jessica K.
    CANADIAN JOURNAL OF BEHAVIOURAL SCIENCE-REVUE CANADIENNE DES SCIENCES DU COMPORTEMENT, 2017, 49 (02): : 78 - 88
  • [13] Is Exploratory Factor Analysis Always to Be Preferred? A Systematic Comparison of Factor Analytic Techniques Throughout the Confirmatory-Exploratory Continuum
    Najera, Pablo
    Abad, Francisco J.
    Sorrel, Miguel A.
    PSYCHOLOGICAL METHODS, 2025, 30 (01) : 16 - 39
  • [14] Confirmatory and Exploratory Factor Analysis for Validating the Phlegm Pattern Questionnaire for Healthy Subjects
    Kim, Hyunho
    Ku, Boncho
    Kim, Jong Yeol
    Park, Young-Jae
    Park, Young-Bae
    EVIDENCE-BASED COMPLEMENTARY AND ALTERNATIVE MEDICINE, 2016, 2016
  • [15] Evaluating Avoidable Heterogeneity in Exploratory Factor Analysis Results
    Manapat, Patrick D.
    Anderson, Samantha F.
    Edwards, Michael C.
    MULTIVARIATE BEHAVIORAL RESEARCH, 2023, 58 (01) : 145 - 146
  • [16] Iteration of Partially Specified Target Matrices: Applications in Exploratory and Bayesian Confirmatory Factor Analysis
    Moore, Tyler M.
    Reise, Steven P.
    Depaoli, Sarah
    Haviland, Mark G.
    MULTIVARIATE BEHAVIORAL RESEARCH, 2015, 50 (02) : 149 - 161
  • [17] Searching for radical new product ideas: exploratory and confirmatory factor analysis for construct validation
    Nicholas, John
    Ledwith, Ann
    Aloini, Davide
    Martini, Antonella
    Nosella, Anna
    INTERNATIONAL JOURNAL OF TECHNOLOGY MANAGEMENT, 2015, 68 (1-2) : 70 - 98
  • [18] Old and new ideas for data screening and assumption testing for exploratory and confirmatory factor analysis
    Flora, David B.
    LaBrish, Cathy
    Chalmers, R. Philip
    FRONTIERS IN PSYCHOLOGY, 2012, 3
  • [19] A Comparison of Reliability Estimation Based on Confirmatory Factor Analysis and Exploratory Structural Equation Models
    Fu, Yuanshu
    Wen, Zhonglin
    Wang, Yang
    EDUCATIONAL AND PSYCHOLOGICAL MEASUREMENT, 2022, 82 (02) : 205 - 224
  • [20] Development of framework for just-in-time implementation in maintenance: An ISM-MICMAC approach
    Phogat, Sandeep
    Gupta, Anil Kumar
    JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2018, 24 (04) : 488 - 510