Due-date assignment for multi-server multi-stage assembly systems

被引:6
作者
Yaghoubi, Saeed [1 ]
机构
[1] Iran Univ Sci & Technol, Dept Ind Engn, Tehran, Iran
关键词
due-date assignment; Markov processes; queuing; assembly system; LEAD TIME CONTROL; SINGLE-MACHINE; PROCESSING TIMES; FINITE BUFFERS; PERFORMANCE ANALYSIS; UNRELIABLE MACHINES; SCHEDULING RESEARCH; QUEUING THEORY; THROUGHPUT; QUEUES;
D O I
10.1080/00207721.2013.815826
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, we attempt to present a constant due-date assignment policy in a multi-server multi-stage assembly system. This system is modelled as a queuing network, where new product orders are entered into the system according to a Poisson process. It is assumed that only one type of product is produced by the production system and multi-servers can be settled in each service station. Each operation of every work is operated at a devoted service station with only one of the servers located at a node of the network based on first come, first served (FCFS) discipline, while the processing times are independent random variables with exponential distributions. It is also assumed that the transport times between each pair of service stations are independent random variables with generalised Erlang distributions. Each product's end result has a penalty cost that is some linear function of its due date and its actual lead time. The due date is calculated by adding a constant to the time that the order enters into the system. Indeed, this constant value is decided at the beginning of the time horizon and is the constant lead time that a product might expect between the time of placing the order and the time of delivery. For computing the due date, we first convert the queuing network into a stochastic network with exponentially distributed arc lengths. Then, by constructing an appropriate finite-state continuous-time Markov model, a system of differential equations is created to find the manufacturing lead-time distribution for any particular product, analytically. Finally, the constant due date for delivery time is obtained by using a linear function of its due date and minimising the expected aggregate cost per product.
引用
收藏
页码:1246 / 1256
页数:11
相关论文
共 53 条
[1]   DUE DATE ASSIGNMENT, JOB ORDER RELEASE, AND SEQUENCING INTERACTION IN JOB SHOP SCHEDULING [J].
AHMED, I ;
FISHER, WW .
DECISION SCIENCES, 1992, 23 (03) :633-647
[2]  
[Anonymous], 1979, Introduction to dynamic systems: theory, models, and applica-tions
[3]   A multi-objective lead time control problem in multistage assembly systems using an interactive method [J].
Azaron, A ;
Kianfar, F .
APPLIED MATHEMATICS AND COMPUTATION, 2006, 176 (02) :609-620
[4]   Distribution function of the shortest path in networks of queues [J].
Azaron, A ;
Modarres, M .
OR SPECTRUM, 2005, 27 (01) :123-144
[5]   Modelling complex assemblies as a queueing network for lead time control [J].
Azaron, Amir ;
Katagiri, Hideki ;
Kato, Kosuke ;
Sakawa, Masatoshi .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 174 (01) :150-168
[6]   Due date assignment for multistage assembly systems [J].
Azaron, Amir ;
Kianfar, Farhad .
OPTIMIZATION LETTERS, 2009, 3 (02) :199-210
[7]   A PREDICTIVE MODEL FOR THE THROUGHPUT OF SIMPLE ASSEMBLY SYSTEMS [J].
BAKER, KR ;
POWELL, SG .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 81 (02) :336-345
[8]   A SURVEY OF EXACT ALGORITHMS FOR THE SIMPLE ASSEMBLY LINE BALANCING PROBLEM [J].
BAYBARS, I .
MANAGEMENT SCIENCE, 1986, 32 (08) :909-932
[9]  
Bhat U. N., 1986, Queueing Systems Theory and Applications, V1, P85, DOI 10.1007/BF01149329
[10]   Common due date assignment for scheduling on a single machine with jointly reducible processing times [J].
Biskup, D ;
Jahnke, H .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 69 (03) :317-322