Geotechnical challenges for the Los Angeles to Pasadena Metro Gold Line Rail Transit Project

被引:0
作者
Lew, M [1 ]
Hudson, MB [1 ]
Acosta, JA [1 ]
Kirkgard, SF [1 ]
机构
[1] MACTEC Engn & Consulting Inc, Los Angeles, CA 90040 USA
来源
GEOTECHNICAL ENGINEERING FOR TRANSPORTATION PROJECTS, VOL 2 | 2004年 / 126期
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Los Angeles to Pasadena Metro Gold Line Rail Transit Project provided many challenges with a variety of different geotechnical conditions along its alignment. The conditions include areas of deep existing fill soils at Union Station and the Yard and Shops area. Evaluations were made as to whether the existing fill could be used for support or whether the fill should be improved. The project includes a major crossing over the Los Angeles River where there were different soil and rock conditions at the two major pier locations. The project crosses a known active landslide area which required evaluation of stability and adequacy of mitigation measures. The project includes two areas of below grade construction in materials difficult to excavate; one of the areas was adjacent to an historic commercial district with many older unreinforced masonry buildings sensitive to ground movement. The project also had a crossing over the trace of an active earthquake fault.
引用
收藏
页码:1592 / 1601
页数:10
相关论文
共 50 条
  • [41] Stranding Cycling Transit Users on Los Angeles' Orange Line Bus Rapid Transit
    Olwert, Craig T.
    Tchopourian, Jose
    Arellano, Vicente O.
    Woldeamanuel, Mintesnot
    JOURNAL OF PUBLIC TRANSPORTATION, 2015, 18 (01)
  • [42] THE GEOTECHNICAL INVESTIGATION AND EVALUATION FOR KUNMING LIGHT RAIL TRANSIT LINE 3
    Liu, Wei
    Zhang, Xu
    He, Jialiang
    NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 126 - 131
  • [43] SANTA-BARBARA-LOS-ANGELES LINE PROJECT PRESSED
    WILLIAMS, B
    OIL & GAS JOURNAL, 1984, 82 (42) : 72 - 74
  • [44] LOS-ANGELES-TRANSIT-POLICE - A UNIQUE AGENCY TAKING ON UNIQUE CHALLENGES
    BUDDS, H
    POLICE CHIEF, 1982, 49 (02) : 30 - 31
  • [45] Geotechnical Challenges of Tehran Metro Line 7 (South Northern Route)
    Sadjadi, Farzad
    Khalkhali, Ahad Bagherzadeh
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2018, 4 (05): : 1117 - 1126
  • [46] Research on Engineering Variations Management of Urban Rail Transit Project in BT Mode - A Case of Shenzhen Metro Line 5
    Lu, Xiao-chun
    Yin, Yi-lin
    PROCEEDINGS OF 2012 3RD INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION (IEMI2012), 2013, : 281 - 289
  • [47] Geotechnical challenges faced on line 2 of the Greater Cairo Metro System
    Campo, DW
    Richards, DP
    BIG DIGS AROUND THE WORLD, 1998, (86): : 358 - 379
  • [48] MASS TRANSIT Work Begins to Connect Light-Rail Lines in Downtown Los Angeles
    Hill, David
    CIVIL ENGINEERING, 2014, 84 (12): : 33 - 35
  • [49] Particulate matter (PM) concentrations in underground and ground-level rail systems of the Los Angeles Metro
    Kam, Winnie
    Cheung, Kalam
    Daher, Nancy
    Sioutas, Constantinos
    ATMOSPHERIC ENVIRONMENT, 2011, 45 (08) : 1506 - 1516
  • [50] Does service reliability determine transit patronage? Insights from the Los Angeles Metro bus system
    Chakrabarti, Sandip
    Giuliano, Genevieve
    TRANSPORT POLICY, 2015, 42 : 12 - 20