Geotechnical challenges for the Los Angeles to Pasadena Metro Gold Line Rail Transit Project

被引:0
作者
Lew, M [1 ]
Hudson, MB [1 ]
Acosta, JA [1 ]
Kirkgard, SF [1 ]
机构
[1] MACTEC Engn & Consulting Inc, Los Angeles, CA 90040 USA
来源
GEOTECHNICAL ENGINEERING FOR TRANSPORTATION PROJECTS, VOL 2 | 2004年 / 126期
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Los Angeles to Pasadena Metro Gold Line Rail Transit Project provided many challenges with a variety of different geotechnical conditions along its alignment. The conditions include areas of deep existing fill soils at Union Station and the Yard and Shops area. Evaluations were made as to whether the existing fill could be used for support or whether the fill should be improved. The project includes a major crossing over the Los Angeles River where there were different soil and rock conditions at the two major pier locations. The project crosses a known active landslide area which required evaluation of stability and adequacy of mitigation measures. The project includes two areas of below grade construction in materials difficult to excavate; one of the areas was adjacent to an historic commercial district with many older unreinforced masonry buildings sensitive to ground movement. The project also had a crossing over the trace of an active earthquake fault.
引用
收藏
页码:1592 / 1601
页数:10
相关论文
共 50 条
  • [31] Open for business? Effects of Los Angeles Metro Rail construction on adjacent businesses
    Ray, Rosalie
    JOURNAL OF TRANSPORT AND LAND USE, 2017, 10 (01) : 725 - 742
  • [32] Evaluation of Empirical Methods for Estimating Tunneling-Induced Ground Movements-Los Angeles Metro K Line Crenshaw/LAX Transit Project
    Zhao, Wendi
    Hashash, Youssef M. A.
    Jasiak, Maksymilian
    Lawrence, Jack
    Hutter, Abby
    Bernard, Timothy
    Szewczyk, Alicia Josephina
    Beaino, Charbel
    Pearce, Michael
    Lemnitzer, Anne
    Star, Lisa
    Sathialingam, Namasivayam
    Cording, Edward J.
    O'Rourke, Thomas D.
    Danielians, Androush
    GEO-CONGRESS 2023: GEOTECHNICAL SYSTEMS FROM PORE-SCALE TO CITY-SCALE, 2023, : 501 - 514
  • [33] Semi-Empirical Method for Excavation-Induced Surface Displacements-Los Angeles Metro K Line Crenshaw/LAX Transit Project
    Beaino, Charbel
    Hashash, Youssef M. A.
    Bernard, Timothy
    Hutter, Abby
    Jasiak, Maksymilian
    Lawrence, Jack
    Szewczyk, Alicia
    Zhao, Wendi
    Pearce, Michael
    Lemnitzer, Anne
    Star, Lisa
    Sathialingam, Namasivayam
    Cording, Edward J.
    O'Rourke, Thomas D.
    Danielians, Androush
    GEO-CONGRESS 2023: GEOTECHNICAL SYSTEMS FROM PORE-SCALE TO CITY-SCALE, 2023, : 492 - 500
  • [34] Bus rapid transit or light, rail transit - How to decide? Los Angeles case study
    Stutsman, JM
    TRANSIT: INTERMODAL FACILITIES, RAIL TRANSIT, COMMUTER RAIL, LIGHT RAIL TRANSIT, MAINTENANCE, AND FERRY TRANSPORTATION: PUBLIC TRANSIT, 2002, (1793): : 55 - 61
  • [36] Effect of Rail Transit on Crime: A Study of Los Angeles from 1988 to 2014
    Ridgeway, Greg
    MacDonald, John M.
    JOURNAL OF QUANTITATIVE CRIMINOLOGY, 2017, 33 (02) : 277 - 291
  • [37] Effect of Rail Transit on Crime: A Study of Los Angeles from 1988 to 2014
    Greg Ridgeway
    John M. MacDonald
    Journal of Quantitative Criminology, 2017, 33 : 277 - 291
  • [38] Design and construction of the Los Angeles Metro Rail tunnels in hydrogen sulfide and methane environment
    Ghadiali, BM
    Murthy, KN
    Elioff, MA
    Putnam, JB
    TUNNELS FOR PEOPLE, VOLS 1 AND 2, 1997, : 133 - 138
  • [39] Los Angeles, California, Metro Green Line - A why are people riding the line to nowhere?
    Mieger, David
    Chu, Chaushie
    TRANSPORTATION RESEARCH RECORD, 2007, (2006) : 50 - 59
  • [40] Transportation - Design/build used for first time for Los Angeles Metro Project
    不详
    CIVIL ENGINEERING, 2000, 70 (08): : 18 - 18