Geometric process repair model for an unreliable production system with an intermediate buffer

被引:12
作者
Cheng, Guoqing [1 ,2 ]
Zhou, Binghai [1 ]
Li, Ling [2 ]
机构
[1] Tongji Univ, Sch Mech Engn, Caoan Rd, Shanghai, Peoples R China
[2] Jingdezhen Ceram Inst, Dept Informat Engn, Jingdezhen, Peoples R China
基金
中国国家自然科学基金;
关键词
Production system; deteriorating system; buffer stock; imperfect repair; replacement; average cost rate; OPTIMAL REPLACEMENT POLICY; PREVENTIVE MAINTENANCE; PRODUCTION UNIT; MANUFACTURING SYSTEMS; DETERIORATING SYSTEM; DEGENERATIVE SYSTEM; OPTIMIZATION; AVAILABILITY; INVENTORY; CAPACITY;
D O I
10.1177/0954408916636921
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
In this paper, we consider an unreliable production system consisting of two machines (M1 and M2) in which M1 produces a single product type to satisfy a constant and continuous demand of M2 and it is subjected to random failures. In order to palliate perturbations caused by failures, a buffer stock is built up to satisfy the demand during the production unavailability of M1. A traditional assumption made in the previous research is that repairs can restore the failed machines to as good as new state. To develop a more realistic mathematical model of the system, we relax this assumption by assuming that the working times of M1 after repairs are geometrically decreasing, which means M1 cannot be repaired as good as new. Undergoing a specified number of repairs, M1 will be replaced by an identical new one. A bivariate policy (S,N) is considered, where S is the buffer stock level and N is the number of failures at which M1 is replaced. We derive the long-run average cost rate C(S,N) used as the basis for optimal determination of the bivariate policy. The optimal policies S* and N* are derived, respectively. Then, an algorithm is presented to find the optimal joint policy (S,N)*. Finally, an illustrative example is given to validate the proposed model. Sensitivity analyses are also carried out to illustrate the effectiveness and robustness of the proposed methodology.
引用
收藏
页码:747 / 759
页数:13
相关论文
共 37 条
[1]   Some theoretical properties of the geometric and α-series processes [J].
Braun, W. John ;
Li, Wei ;
Zhao, Yiqiang Q. .
COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 2008, 37 (09) :1483-1496
[2]   Properties of the geometric and related processes [J].
Braun, WJ ;
Li, W ;
Zhao, YQQ .
NAVAL RESEARCH LOGISTICS, 2005, 52 (07) :607-616
[3]   Reward optimization of a repairable system [J].
Castro, IT ;
Pérez-Ocón, R .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2006, 91 (03) :311-319
[4]   Modelling SARS data using threshold geometric process [J].
Chan, Jennifer S. K. ;
Yu, Philip L. H. ;
Lam, Yeh ;
Ho, Alvin P. K. .
STATISTICS IN MEDICINE, 2006, 25 (11) :1826-1839
[5]   Analysis of a production/inventory system with randomly failing production unit subjected to a minimum required availability level [J].
Chelbi, A ;
Rezg, N .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 99 (1-2) :131-143
[6]   Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance [J].
Chelbi, A ;
Alt-Kadi, D .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 156 (03) :712-718
[7]   An extended extreme shock maintenance model for a deteriorating system [J].
Chen, Jinyuan ;
Li, Zehui .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2008, 93 (08) :1123-1129
[8]   A bivariate optimal imperfect preventive maintenance policy for a used system with two-type shocks [J].
Chen, Yen-Luan .
COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 63 (04) :1227-1234
[9]   An optimal replacement policy for a degenerative system with two-types of failure states [J].
Cheng, Guo Qing ;
Li, Ling .
JOURNAL OF COMPUTATIONAL AND APPLIED MATHEMATICS, 2014, 261 :139-145
[10]   Joint optimal production control/preventive maintenance policy for imperfect process manufacturing cell [J].
Dhouib, K. ;
Gharbi, A. ;
Ben Aziza, M. N. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 137 (01) :126-136