Overall material usage effectiveness (OME): a structured indicator to measure the effective material usage within manufacturing processes

被引:28
作者
Braglia, M. [1 ]
Castellano, D. [2 ]
Frosolini, M. [1 ]
Gallo, M. [3 ]
机构
[1] Univ Pisa, Dipartimento Ingn Civile & Ind, Pisa, Italy
[2] Univ Napoli Federico II, Dipartimento Ingn Chim Mat & Prod Ind, Naples, Italy
[3] Univ Telemat Pegaso, Dipartimento Sci Giurid & Econ, Naples, Italy
关键词
Overall equipment effectiveness; Lean Production; material loss; performance measurements; indicator; EQUIPMENT EFFECTIVENESS OEE; MANAGEMENT; IMPLEMENTATION; EFFICIENCY; ENERGY;
D O I
10.1080/09537287.2017.1395920
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A rational use of production resources has been catalysing the attention of researchers and practitioners for several years. A number of indicators have been proposed to assess the effective and efficient use of the various production factors. A widely known example of these metrics is the overall equipment effectiveness (OEE), which applies to machines and equipment. This paper proposes a novel methodology that seizes upon OEE's straight forward and easy-to-use structure to address the problem of measuring the effective use of materials within a factory. An inclusive structure of material loss and a methodology to calculate a novel performance indicator called overall material usage effectiveness (OME) is given. The proposed set of KPIs not only permits the comprehension of material-related issues but also the identification of viable countermeasures. A real-life application to demonstrate the practical usefulness of the methodology and illustrate the capability of its KPIs is described.
引用
收藏
页码:143 / 157
页数:15
相关论文
共 35 条
[1]   Conceptual sustainable production principles in practice: Do they reflect what companies do? [J].
Alayon, C. ;
Safsten, K. ;
Johansson, G. .
JOURNAL OF CLEANER PRODUCTION, 2017, 141 :693-701
[2]   Material efficiency: A white paper [J].
Allwood, Julian M. ;
Ashby, Michael F. ;
Gutowski, Timothy G. ;
Worrell, Ernst .
RESOURCES CONSERVATION AND RECYCLING, 2011, 55 (03) :362-381
[3]   An analysis of managerial factors affecting the implementation and use of overall equipment effectiveness [J].
Aminuddin, Nur Ainunnazli Binti ;
Garza-Reyes, Jose Arturo ;
Kumar, Vikas ;
Antony, Jiju ;
Rocha-Lona, Luis .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (15) :4430-4447
[4]   On the complexity of using performance measures: Enhancing sustained production improvement capability by combining OEE and productivity [J].
Andersson, C. ;
Bellgran, M. .
JOURNAL OF MANUFACTURING SYSTEMS, 2015, 35 :144-154
[5]  
[Anonymous], 2013, TOTAL MAT MANAGEMENT
[6]  
[Anonymous], 2007, LEAN ENV TOOLK
[7]  
[Anonymous], 1988, INTRO TO TPM
[8]  
[Anonymous], 2012, INT J ENG INNOVATION
[9]  
[Anonymous], 2011, TECHN MAN EN SMART W
[10]  
[Anonymous], 2014, P 9 INT DAAAM BALT C