Critical Factors Influencing Interface Management of Prefabricated Building Projects: Evidence from China

被引:28
|
作者
Zhang, Shengxi [1 ]
Li, Zhongfu [1 ]
Ma, Shengbin [1 ]
Li, Long [2 ]
Yuan, Mengqi [1 ,3 ]
机构
[1] Dalian Univ Technol, Dept Construct Management, Dalian 116024, Peoples R China
[2] Qingdao Univ Technol, Sch Management Engn, Qingdao 266000, Peoples R China
[3] City Univ Hong Kong, Dept Architectural & Civil Engn, Hong Kong 999077, Peoples R China
基金
中国国家自然科学基金;
关键词
interface management; prefabricated building; sustainable development; critical factors; factor analysis; OFF-SITE CONSTRUCTION; SUPPLY CHAIN MANAGEMENT; HOUSING PRODUCTION; INDUSTRIALIZED CONSTRUCTION; MARKETING INTERFACE; MODEL; INNOVATION; DESIGN; SYSTEM; BIM;
D O I
10.3390/su14095418
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Recently, interface management has been regarded as the key to the success of prefabricated building projects (PBPs) due to its capabilities to manage numerous interfaces caused by PBPs' inherent geographical and organizational fragmentation. However, the factors influencing the interface management of PBPs are largely unknown and poorly studied. To compensate for this gap, this study aimed to investigate the critical factors influencing interface management in PBPs with quantitative and qualitative methods. Twenty-seven critical factors influencing the interface management of PBPs were identified through a literature review, questionnaire survey, and face-to-face interviews with professionals in the construction industry. A questionnaire survey was sent out to developers, designers, manufacturers, contractors, and consultants in China, and 66 completed questionnaires were received. Results showed the top five critical factors influencing the interface management of PBPs were (1) accuracy of design, (2) timeliness of information communication, (3) timeliness of component production and supply, (4) standardization of design, and (5) definition of work content and scope. The 27 influencing factors of PBPs were further categorized into seven groups via exploratory factor analysis, namely: (1) information communication, (2) trust and cooperation, (3) technical and management capability, (4) organizational integration, (5) standardization, (6) technical environment, and (7) contractual management. Improving these issues will contribute to the successful implementation of PBPs. Finally, combined with relevant literature and expert interviews, the impact of these seven clusters on the interface management of PBPs was discussed. The findings may contribute to deepening the understanding of interface management, reducing unnecessary conflicts and difficulties, and promoting the sustainable development of prefabricated building (PB).
引用
收藏
页数:20
相关论文
共 50 条
  • [21] Factors influencing workplace accident costs of building projects
    Peng, Yingbin
    Zhang, Shang
    Wu, Peng
    SAFETY SCIENCE, 2015, 72 : 97 - 104
  • [22] Value Management in Singaporean Building Projects: Implementation Status, Critical Success Factors, and Risk Factors
    Hwang, Bon-Gang
    Zhao, Xianbo
    Ong, Shi Ying
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (06)
  • [23] Potential management factors influencing construction projects
    Vigneshwar, R. V. K.
    Shanmugapriya, S.
    GRADEVINAR, 2022, 74 (12): : 1037 - 1046
  • [24] Identification of Critical Factors Influencing Prefabricated Construction Quality and Their Mutual Relationship
    Zhang, Ke
    Tsai, Jiin-Song
    SUSTAINABILITY, 2021, 13 (19)
  • [25] Exploring Critical Factors Influencing the Resilience of the Prefabricated Construction Supply Chain
    Liu, Tianyang
    Ma, Li
    Fu, Hongwei
    BUILDINGS, 2025, 15 (02)
  • [26] Identifying Critical Influencing Factors of the Value Creation of Urban Rail Transit PPP Projects in China
    Li, Xuewei
    Yuan, Jingfeng
    Liu, Xuan
    Ke, Yongjian
    Jia, Sijia
    BUILDINGS, 2022, 12 (08)
  • [27] Critical factors influencing the internet of things technology adoption behavior of construction companies: evidence from China
    Zhao, Yaqi
    Hao, Shengyue
    Chen, Zhen
    Zhou, Xia
    Zhang, Lin
    Guo, Zhaoyang
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 32 (02) : 760 - 784
  • [28] Critical Project Management Factors of AEC Firms for Delivering Green Building Projects in Singapore
    Li, Yuan Yuan
    Chen, Po-Han
    Chew, David Ah Seng
    Teo, Chee Chong
    Ding, Rong Gui
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2011, 137 (12) : 1153 - 1163
  • [29] The Efficiency of the Chinese Prefabricated Building Industry and Its Influencing Factors: An Empirical Study
    Shang, Zufeng
    Wang, Fenglai
    Yang, Xu
    SUSTAINABILITY, 2022, 14 (17)
  • [30] Factors influencing the application of prefabricated construction in China: From perspectives of technology promotion and cleaner production
    Wu, Guobin
    Yang, Ru
    Li, Ling
    Bi, Xing
    Liu, Bingsheng
    Li, Shaoyan
    Zhou, Shixiang
    JOURNAL OF CLEANER PRODUCTION, 2019, 219 : 753 - 762