Critical Factors Influencing Interface Management of Prefabricated Building Projects: Evidence from China

被引:28
作者
Zhang, Shengxi [1 ]
Li, Zhongfu [1 ]
Ma, Shengbin [1 ]
Li, Long [2 ]
Yuan, Mengqi [1 ,3 ]
机构
[1] Dalian Univ Technol, Dept Construct Management, Dalian 116024, Peoples R China
[2] Qingdao Univ Technol, Sch Management Engn, Qingdao 266000, Peoples R China
[3] City Univ Hong Kong, Dept Architectural & Civil Engn, Hong Kong 999077, Peoples R China
基金
中国国家自然科学基金;
关键词
interface management; prefabricated building; sustainable development; critical factors; factor analysis; OFF-SITE CONSTRUCTION; SUPPLY CHAIN MANAGEMENT; HOUSING PRODUCTION; INDUSTRIALIZED CONSTRUCTION; MARKETING INTERFACE; MODEL; INNOVATION; DESIGN; SYSTEM; BIM;
D O I
10.3390/su14095418
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Recently, interface management has been regarded as the key to the success of prefabricated building projects (PBPs) due to its capabilities to manage numerous interfaces caused by PBPs' inherent geographical and organizational fragmentation. However, the factors influencing the interface management of PBPs are largely unknown and poorly studied. To compensate for this gap, this study aimed to investigate the critical factors influencing interface management in PBPs with quantitative and qualitative methods. Twenty-seven critical factors influencing the interface management of PBPs were identified through a literature review, questionnaire survey, and face-to-face interviews with professionals in the construction industry. A questionnaire survey was sent out to developers, designers, manufacturers, contractors, and consultants in China, and 66 completed questionnaires were received. Results showed the top five critical factors influencing the interface management of PBPs were (1) accuracy of design, (2) timeliness of information communication, (3) timeliness of component production and supply, (4) standardization of design, and (5) definition of work content and scope. The 27 influencing factors of PBPs were further categorized into seven groups via exploratory factor analysis, namely: (1) information communication, (2) trust and cooperation, (3) technical and management capability, (4) organizational integration, (5) standardization, (6) technical environment, and (7) contractual management. Improving these issues will contribute to the successful implementation of PBPs. Finally, combined with relevant literature and expert interviews, the impact of these seven clusters on the interface management of PBPs was discussed. The findings may contribute to deepening the understanding of interface management, reducing unnecessary conflicts and difficulties, and promoting the sustainable development of prefabricated building (PB).
引用
收藏
页数:20
相关论文
共 104 条
  • [31] Product complexity, innovation and industrial organisation
    Hobday, M
    [J]. RESEARCH POLICY, 1998, 26 (06) : 689 - 710
  • [32] Detecting and Deterring Insufficient Effort Responding to Surveys
    Huang, Jason L.
    Curran, Paul G.
    Keeney, Jessica
    Poposki, Elizabeth M.
    DeShon, Richard P.
    [J]. JOURNAL OF BUSINESS AND PSYCHOLOGY, 2012, 27 (01) : 99 - 114
  • [33] A Study on the Incentive Policy of China's Prefabricated Residential Buildings Based on Evolutionary Game Theory
    Huang, Qiyun
    Wang, Junwu
    Ye, Mengwei
    Zhao, Shiman
    Si, Xiang
    [J]. SUSTAINABILITY, 2022, 14 (03)
  • [34] Huang RY, 2008, J MAR SCI TECH-TAIW, V16, P52
  • [35] Knowledge-based decision support system for prefabricated prefinished volumetric construction
    Hwang, Bon-Gang
    Shan, Ming
    Looi, Kit-Ying
    [J]. AUTOMATION IN CONSTRUCTION, 2018, 94 : 168 - 178
  • [36] A new approach to building design modularization
    Isaac, Shabtai
    Bock, Thomas
    Stoliar, Yaniv
    [J]. CREATIVE CONSTRUCTION CONFERENCE 2014, 2014, 85 : 274 - 282
  • [37] Bridging social and technical interfaces in organizations: An interpretive analysis of time-space distanciation
    Jin, Leigh
    Robey, Daniel
    [J]. INFORMATION AND ORGANIZATION, 2008, 18 (03) : 177 - 204
  • [38] Classification of production systems for industrialized building: a production strategy perspective
    Jonsson, Henric
    Rudberg, Martin
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2014, 32 (1-2) : 53 - 69
  • [39] OPTIMIZATION STRATEGIES TO ELIMINATE INTERFACE CONFLICTS IN COMPLEX SUPPLY CHAINS OF CONSTRUCTION PROJECTS
    Ju, Qianqian
    Ding, Lieyun
    Skibniewski, Miroslaw J.
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2017, 23 (06) : 712 - 726
  • [40] Kieran S., 2003, refabricating ARCHITECTURE: How Manufacturing Methodologies are Poised to Transform Building Construction