Cost benefits of optimizing hydrogen storage and methanation capacities for Power-to-Gas plants in dynamic operation

被引:189
作者
Gorre, Jachin [1 ]
Ruoss, Fabian [1 ]
Karjunen, Hannu [2 ]
Schaffert, Johannes [3 ]
Tynjala, Tero [2 ]
机构
[1] Univ Appl Sci Rapperswil, Oberseestr 10, CH-8640 Rapperswil, Switzerland
[2] Lappeenranta Lahti Univ Technol LUT, Yliopistonkatu 34,PL 20, Lappeenranta 53851, Finland
[3] Gas & Warme Inst Essen eV, Hafenstr 101, D-45356 Essen, Germany
基金
欧盟地平线“2020”;
关键词
Power-to-Gas; Hydrogen interim storage; Dynamic operation; Optimization; Cost reduction; Operation strategy; ALKALINE WATER ELECTROLYZERS; ENERGY-STORAGE; LEVELISED COST; SYSTEM; TECHNOLOGIES; PERFORMANCE; GENERATION;
D O I
10.1016/j.apenergy.2019.113967
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Power-to-Gas technologies offer a promising approach for converting renewable electricity into a molecular form (fuel) to serve the energy demands of non-electric energy applications in all end-use sectors. The technologies have been broadly developed and are at the edge of a mass roll-out. The barriers that Power-to-Gas faces are no longer technical, but are, foremost, regulatory, and economic. This study focuses on a Power-to-Gas pathway, where electricity is first converted in a water electrolyzer into hydrogen, which is then synthetized with carbon dioxide to produce synthetic natural gas. A key aspect of this pathway is that an intermittent electricity supply could be used, which could reduce the amount of electricity curtailment from renewable energy generation. Interim storages would then be necessary to decouple the synthesized part from hydrogen production, to enable (I) longer continuous operation cycles for the methanation reactor, and (II) increased annual full-load hours, leading to an overall reduction in gas production costs. This work optimizes a Power-to-Gas plant configuration with respect to the cost benefits using a Monte Carlo-based simulation tool. The results indicate potential cost reductions of up to 17% in synthetic natural gas production by implementing well-balanced components and interim storages. This study also evaluates three different power sources which differ greatly in their optimal system configuration. Results from time-resolved simulations and sensitivity analyses for different plant designs and electricity sources are discussed with respect to technical and economic implications, so as to facilitate a plant design process for decision makers.
引用
收藏
页数:14
相关论文
共 64 条
  • [1] Influence of operation parameters in the modeling of alkaline water electrolyzers for hydrogen production
    Amores, Ernesto
    Rodriguez, Jesus
    Carreras, Christian
    [J]. INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, 2014, 39 (25) : 13063 - 13078
  • [2] [Anonymous], THUGA GROUP POWER TO
  • [3] [Anonymous], WIRKUNGSGRAD OPTIMIE
  • [4] [Anonymous], 2013, POTENTIAL CHALLENGES
  • [5] [Anonymous], WIRKUNGSGRAD OPTIMIE
  • [6] [Anonymous], EUR NETW TRANSM SYST
  • [7] [Anonymous], 2019, D77 STORE GO
  • [8] [Anonymous], BESCHR REG REG
  • [9] [Anonymous], 10 INT REN EN STOR C
  • [10] [Anonymous], D8 3 REPORT COSTS IN