Making business sense of distribution automation systems:: The case of Eskom, South Africa

被引:7
作者
Gütschow, D
Kachieng'a, MO
机构
[1] Eskom Holdings, Distribut Technol Dept, Cape Town, South Africa
[2] Univ Pretoria, Engn & Technol Management Dept, ZA-0002 Pretoria, South Africa
关键词
finance; life cycle costing; power distribution; power distribution reliability; power quality; power system control;
D O I
10.1109/TPWRS.2004.841215
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Despite the plethora of Distribution Automation (DA) activity that occurred in the last two decades, very few utilities have embarked on large-scale DA implementation. The main reasons for this appears to have been uncertainty about which DA functions should be implemented and, second, the difficulty in financially justifying DA investments. The paper investigates the combination of DA functions that could best address Eskom's business requirements and, second, upon reaching this conclusion, proceeds to develop a model by which proposed investments in DA systems could be evaluated.
引用
收藏
页码:272 / 278
页数:7
相关论文
共 16 条
  • [1] BLAIR WE, IEEE T POWER APP SYS, V104, P2954
  • [2] CLINARD K, 1994, P 3 INT S DISTR AUT, P522
  • [3] COFFEY J, 2001, 4 SO AFR REG CIGR C
  • [4] GRUENEMEYER D, 1991, P 35 RUR EL POW C
  • [5] GUTSCHOW D, 2003, THESIS U PRET DEP EN
  • [6] MARAIS A, 1998, DISTRIBUTION AUTOMAT
  • [7] MENDIOLA MC, 2000 INT C CEPSI
  • [8] NEWTON C, 1991, TRANSM DISTRIB, V51, P68
  • [9] NICHOLAS JM, 2001, PROJECT MANAGEMENT B, P121
  • [10] PAHWA A, 2001, P IEEE POW ENG SOC T, V2, P1204