Study on Improved GPGP-Based Multi-agent Semiconductor Fabrication Line Dynamic Scheduling Method

被引:0
|
作者
Ma, Xin [1 ]
He, Ying [1 ]
机构
[1] Jilin Univ, Coll Comp Sci & Technol, Changchun 130023, Peoples R China
来源
ADVANCES IN SWARM INTELLIGENCE, PT 1, PROCEEDINGS | 2010年 / 6145卷
关键词
semiconductor fabrication line dynamic scheduling problem; multi-intelligence algorithm; multi-agent system; improved generalized partial global planning;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
A semiconductor fabrication line dynamic scheduling(SFLDS) model combining MAS(Multi-Agent System) with multi-intelligence algorithms is presented in this paper The proposed model is based on the improved generalized partial global planning(GPGP) and utilizes the advantages of static intelligence algorithms with dynamic MAS A scheduling process from 'macro-schedulring g to mono-scheduling to repeated- scheduling' is designed for large-scale complex problems to enable to implement an effective and widely applicable prototype system for SFLDS Under this scheme, a set of limitation and improvement of GPGP about its structure are proposed The improved GPGP and us model are simulated by using simulation software eM-plant A case study is provided to examine the practicability. flexibility and robustness of the proposed scheduling approach
引用
收藏
页码:659 / 666
页数:8
相关论文
共 50 条
  • [1] Research on ETAEMS/GPGP-CN based dynamic scheduling technology of semiconductor fabrication line
    Zhai, W. (zwbin-2000@yahoo.com.cn), 2005, Editorial Office of Chinese Journal of Mechanical Engineering (41):
  • [2] Dynamic Scheduling Method Based on Multi-Agent for Cold Rolling Whole Line
    Wang Li
    Gao Xianwen
    Wang Wei
    Zhao Jun
    2013 32ND CHINESE CONTROL CONFERENCE (CCC), 2013, : 8082 - 8087
  • [3] Production Dynamic Scheduling Method Based on Improved Contract Net of Multi-agent
    Qin, Ling
    Kan, Shulin
    INTELLIGENCE COMPUTATION AND EVOLUTIONARY COMPUTATION, 2013, 180 : 929 - 936
  • [4] Multi-agent-based dynamic scheduling method for semiconductor wafer fabrication facilities
    College of Electronics and Information Engineering, Tongji University, Shanghai 200092, China
    Qinghua Daxue Xuebao, 2007, SUPPL. 2 (1895-1898):
  • [5] The new method of dynamic scheduling in semiconductor fabrication line
    Jiang, H
    Li, L
    Qiao, F
    Wu, QD
    2004 8TH INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION, ROBOTICS AND VISION, VOLS 1-3, 2004, : 1874 - 1878
  • [6] Improved job-shop scheduling method based on multi-agent
    Xu, Xinli
    Wang, Xiangli
    Wang, Wanliang
    WSEAS Transactions on Information Science and Applications, 2006, 3 (07): : 1308 - 1315
  • [7] A Hybrid System Dynamic Production Scheduling Method Based On Multi-Agent
    Ma, Xiaofeng
    2012 INTERNATIONAL CONFERENCE ON INDUSTRIAL CONTROL AND ELECTRONICS ENGINEERING (ICICEE), 2012, : 179 - 181
  • [8] Multi-agent based framework for dynamic scheduling system
    Zhang, Xiao-Dong
    Wang, Qian
    Li, Xiao-Ping
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2007, : 3838 - 3843
  • [9] Multi-agent system for dynamic scheduling
    Firme, Bernardo
    Lopes, Guilherme
    Martins, Miguel S. E.
    Coito, Tiago
    Viegas, Joaquim
    Sousa, Joao M. C.
    Reis, Joao C. P.
    Figueiredo, Joao
    Vieira, Susana
    2020 INTERNATIONAL JOINT CONFERENCE ON NEURAL NETWORKS (IJCNN), 2020,
  • [10] Multi-agent reinforcement learning based textile dyeing workshop dynamic scheduling method
    He J.
    Zhang J.
    Zhang P.
    Zheng P.
    Wang M.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (01): : 61 - 74