Warranty Cost Analysis for k-out-of-n Systems With 2-D Warranty

被引:22
|
作者
Park, Minjae [1 ]
Hoang Pham [2 ]
机构
[1] Hongik Univ, Coll Business Adm, Seoul 121791, South Korea
[2] Rutgers State Univ, Dept Ind & Syst Engn, Piscataway, NJ 08854 USA
来源
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS | 2012年 / 42卷 / 04期
关键词
k-out-of-n system; postwarranty period; preventive maintenance (PM); 2-D; warranty cost; QUASI-RENEWAL PROCESS; 2-DIMENSIONAL WARRANTY; MULTICOMPONENT SYSTEMS; SOFTWARE-RELIABILITY; MINIMAL REPAIR; MAINTENANCE; POLICIES; FAILURE;
D O I
10.1109/TSMCA.2012.2183355
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
This paper presents new warranty cost models subject to two types of warranty periods (warranty and postwarranty periods), minimal repairs, and various types of warranty policies including free repair/replacement warranty and prorata warranty for k-out-of-n systems. Two-dimensional warranty is applied to investigate the warranty cost using repair times and failure times. We obtain the long-run expected cost functions per unit time with respect to both the warranty and postwarranty periods by considering the aspects of both the manufacturer and the customer. This paper considers a periodic preventive maintenance (PM) policy with both corrective maintenance and PM and also determines three decision variables including warranty period, repair time limit, and periodical maintenance cycles, which minimize the long-run expected cost. Numerical examples are discussed to demonstrate the applicability of the methodologies, and results including the three optimum decision-variable solution and their corresponding long-run expected cost per unit are derived.
引用
收藏
页码:947 / 957
页数:11
相关论文
共 50 条
  • [31] Reliability evaluation of uncertain k-out-of-n systems with multiple states
    Sheng, Yuhong
    Ke, Hua
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2020, 195
  • [32] Optimal preventive maintenance for repairable weighted k-out-of-n systems
    Hamdan, K.
    Tavangar, M.
    Asadi, M.
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2021, 205
  • [33] The influence of delivery times on repairable k-out-of-N systems with spares
    Chakravarthy, Srinivas R.
    Gomez-Corral, A.
    APPLIED MATHEMATICAL MODELLING, 2009, 33 (05) : 2368 - 2387
  • [34] On optimal allocation of redundancies in random weighted k-out-of-n systems
    Sahoo, Tanmay
    Hazra, Nil Kamal
    APPLIED STOCHASTIC MODELS IN BUSINESS AND INDUSTRY, 2024, 40 (05) : 1245 - 1274
  • [35] Generalized multi-state k-out-of-n:G systems
    Huang, JS
    Zuo, MJ
    Wu, YH
    IEEE TRANSACTIONS ON RELIABILITY, 2000, 49 (01) : 105 - 111
  • [36] Likelihood inference for geometric lifetimes of components of k-out-of-n systems
    Dembinska, Anna
    Jasinski, Krzysztof
    JOURNAL OF COMPUTATIONAL AND APPLIED MATHEMATICS, 2024, 435
  • [37] Bayesian reliability analysis of complex k-out-of-n:L systems under degradation performance
    Saberzadeh, Zahra
    Razmkhah, Mostafa
    Amini, Mohammad
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2023, 231
  • [38] Reliability Analysis for k-out-of-N: F Load Sharing Systems Operating in a Shock Environment
    Huang, Xinqian
    Xu, Liang
    Huang, Ying
    Fang, Yisong
    IEEE ACCESS, 2023, 11 : 18227 - 18233
  • [39] Analysis of Software Reliability Growth Model under Two Types of Fault and Warranty Cost
    Kumar, Gireesh
    Sharma, Richa
    2017 2ND INTERNATIONAL CONFERENCE ON SYSTEM RELIABILITY AND SAFETY (ICSRS), 2017, : 465 - 468
  • [40] Reliability analysis for k-out-of-n(G) systems subject to dependent competing failure processes
    Bian, Lina
    Wang, Guanjun
    Liu, Peng
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 177