Warranty Cost Analysis for k-out-of-n Systems With 2-D Warranty

被引:22
|
作者
Park, Minjae [1 ]
Hoang Pham [2 ]
机构
[1] Hongik Univ, Coll Business Adm, Seoul 121791, South Korea
[2] Rutgers State Univ, Dept Ind & Syst Engn, Piscataway, NJ 08854 USA
来源
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS | 2012年 / 42卷 / 04期
关键词
k-out-of-n system; postwarranty period; preventive maintenance (PM); 2-D; warranty cost; QUASI-RENEWAL PROCESS; 2-DIMENSIONAL WARRANTY; MULTICOMPONENT SYSTEMS; SOFTWARE-RELIABILITY; MINIMAL REPAIR; MAINTENANCE; POLICIES; FAILURE;
D O I
10.1109/TSMCA.2012.2183355
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
This paper presents new warranty cost models subject to two types of warranty periods (warranty and postwarranty periods), minimal repairs, and various types of warranty policies including free repair/replacement warranty and prorata warranty for k-out-of-n systems. Two-dimensional warranty is applied to investigate the warranty cost using repair times and failure times. We obtain the long-run expected cost functions per unit time with respect to both the warranty and postwarranty periods by considering the aspects of both the manufacturer and the customer. This paper considers a periodic preventive maintenance (PM) policy with both corrective maintenance and PM and also determines three decision variables including warranty period, repair time limit, and periodical maintenance cycles, which minimize the long-run expected cost. Numerical examples are discussed to demonstrate the applicability of the methodologies, and results including the three optimum decision-variable solution and their corresponding long-run expected cost per unit are derived.
引用
收藏
页码:947 / 957
页数:11
相关论文
共 50 条
  • [1] Warranty Cost Analyses Using Quasi-Renewal Processes for Multicomponent Systems
    Park, Minjae
    Pham, Hoang
    IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS, 2010, 40 (06): : 1329 - 1340
  • [2] Optimization issues in k-out-of-n systems
    Sheu, Shay-Huai
    Liu, Tzu Hsin
    Tsai, Hsin-Nan
    Zhang, Zhe-George
    APPLIED MATHEMATICAL MODELLING, 2019, 73 : 563 - 580
  • [3] Optimizing Usage and Maintenance Decisions for k-out-of-n Systems of Moving Assets
    Eruguz, Ayse Sena
    Tan, Tarkan
    van Houtum, Geert-Jan
    NAVAL RESEARCH LOGISTICS, 2017, 64 (05) : 418 - 434
  • [4] DOMINATION OF K-OUT-OF-N SYSTEMS
    BEHR, A
    CAMARINOPOULOS, L
    PAMPOUKIS, G
    IEEE TRANSACTIONS ON RELIABILITY, 1995, 44 (04) : 705 - 708
  • [5] Optimum design and replacement policies for k-out-of-n systems with deviation time and cost
    Wang, Junyuan
    Zhao, Xufeng
    Xiang, Jiawei
    ANNALS OF OPERATIONS RESEARCH, 2024, 340 (01) : 593 - 617
  • [6] Warranty cost analysis using alternating quasi-renewal processes with a warranty option
    Yedida, Sarada
    Munavar, Mubashir Unnissa
    Ranjani, R.
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2012, 43 (03) : 507 - 517
  • [7] Reliability Analysis of Uncertain Weighted k-Out-of-n Systems
    Gao, Jinwu
    Yao, Kai
    Zhou, Jian
    Ke, Hua
    IEEE TRANSACTIONS ON FUZZY SYSTEMS, 2018, 26 (05) : 2663 - 2671
  • [8] CONSECUTIVE K-OUT-OF-N SYSTEMS WITH MAINTENANCE
    PAPASTAVRIDIS, SG
    KOUTRAS, MV
    ANNALS OF THE INSTITUTE OF STATISTICAL MATHEMATICS, 1992, 44 (04) : 605 - 612
  • [9] On the estimation of reliability of k-out-of-n systems
    Pham H.
    International Journal of System Assurance Engineering and Management, 2010, 1 (01) : 32 - 35
  • [10] Optimizations of Replacement Policies for Random k-out-of-n Systems
    Zhang, Xiaoning
    Wang, Junyuan
    INTERNATIONAL JOURNAL OF RELIABILITY QUALITY AND SAFETY ENGINEERING, 2022, 29 (04)