Hydropower plant in Rheinfelden officially put into operation

被引:0
|
作者
Heimerl, Stephan
机构
关键词
D O I
暂无
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
引用
收藏
页码:85 / 85
页数:1
相关论文
共 50 条
  • [31] Algorithm of Smart Control System Operation of Small Hydropower Plant
    Varfolomejeva, Renata
    Umbrasko, Inga
    Mahnitko, Anatolij
    2013 12TH INTERNATIONAL CONFERENCE ON ENVIRONMENT AND ELECTRICAL ENGINEERING (EEEIC 2013), 2013, : 330 - 334
  • [32] HYDROPOWER PLANT OPERATION SCENARIOS TO IMPROVE BROWN TROUT HABITAT
    Pragana, I.
    Boavida, I.
    Cortes, R.
    Pinheiro, A.
    RIVER RESEARCH AND APPLICATIONS, 2017, 33 (03) : 364 - 376
  • [33] RECOLLECTIONS HOW CHEMICAL-PLANT IN DWORY WAS PUT INTO OPERATION
    PAWLIKOWSKI, S
    PRZEMYSL CHEMICZNY, 1975, 54 (08): : 425 - 426
  • [35] Capacity optimization of pumped storage hydropower and its impact on an integrated conventional hydropower plant operation
    Nasir, Jehanzeb
    Javed, Adeel
    Ali, Majid
    Ullah, Kafait
    Kazmi, Syed Ali Abbas
    APPLIED ENERGY, 2022, 323
  • [36] Hydropower plant operation rules optimization response to climate change
    Chang, Jianxia
    Wang, Xiaoyu
    Li, Yunyun
    Wang, Yimin
    Zhang, Hongxue
    ENERGY, 2018, 160 : 886 - 897
  • [37] Comments on frequency history article: Question on the rheinfelden plant
    Woodworth, Craig
    IEEE Power and Energy Magazine, 2012, 10 (04):
  • [38] Tuning Model Predictive Control for Rigorous Operation of the Dalsfoss Hydropower Plant
    Jeong, Changhun
    Sharma, Roshan
    ENERGIES, 2022, 15 (22)
  • [39] Experience from peaking operation of a high head hydropower plant in Tanzania
    Skuncke, O
    Rovang, OA
    Mhaiki, DP
    HYDROPOWER IN THE NEW MILLENNIUM, 2001, : 145 - 151
  • [40] Assessment of the economic impact of environmental constraints on annual hydropower plant operation
    Guisandez, Ignacio
    Perez-Diaz, Juan I.
    Wilhelmi, Jose R.
    ENERGY POLICY, 2013, 61 : 1332 - 1343