Optimization of Multiperiod Mixed Train Schedule on High-Speed Railway

被引:0
作者
Zhou, Wenliang [1 ]
Tian, Junli [1 ]
Qin, Jin [1 ]
Deng, Lianbo [1 ]
Wei, TangJian [1 ,2 ]
机构
[1] Cent S Univ, Sch Traff & Transportat Engn, Changsha 410075, Hunan, Peoples R China
[2] East China Jiaotong Univ, Sch Railway Tracks & Transportat, Nanchang 330013, Peoples R China
关键词
MODEL; LINE; ALGORITHMS; STRATEGY; NETWORK; TRACK;
D O I
10.1155/2015/107048
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
For providing passengers with periodic operation trains and making trains' time distribution better fit that of passengers, the multiperiod mixed train schedule is first proposed in this paper. It makes each type of train having same origin, destination, route, and stop stations operate based on a periodic basis and allows different types of train to have various operation periods. Then a model of optimizing multiperiod mixed train schedule is built to minimize passengers generalized travel costs with the constraints of trains of same type operating periodically, safe interval requirements of trains' departure, and arrival times, and so forth. And its heuristic algorithm is designed to optimize the multiperiod mixed train schedule beginning with generating an initial solution by scheduling all types of train type by type and then repeatedly improving their periodic schedules until the objective value cannot be reduced or the iteration number reaches its maximum. Finally, example results illustrate that the proposed model and algorithm can effectively gain a better multiperiod mixed train schedule. However, its passengers deferred times and advanced times are a little higher than these of an aperiodic train schedule.
引用
收藏
页数:14
相关论文
共 30 条
  • [21] Nachtigall K, 1998, PERIODIC NETWORK OPT
  • [22] A constraint generation algorithm for the construction of periodic railway timetables
    Odijk, MA
    [J]. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 1996, 30 (06) : 455 - 464
  • [23] Sahana Sudip Kumar, 2014, International Journal of Intelligent Systems and Applications, V6, P29, DOI 10.5815/ijisa.2014.02.04
  • [24] Serafini P., 1989, SIAM Journal on Discrete Mathematics, V2, P550, DOI [10.1137/0402049, DOI 10.1137/0402049]
  • [25] SZPIGEL B, 1973, OPER RES, V72, P343
  • [26] N-tracked railway traffic re-scheduling during disturbances
    Tornquist, Johanna
    Persson, Jan A.
    [J]. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2007, 41 (03) : 342 - 362
  • [27] Willem L., 2003, CYCLIC RAILWAY TIMET
  • [28] Zhou W. L., DISCRETE DY IN PRESS
  • [29] Coordination Optimization of the First and Last Trains' Departure Time on Urban Rail Transit Network
    Zhou, Wenliang
    Deng, Lianbo
    Xie, Meiquan
    Yang, Xia
    [J]. ADVANCES IN MECHANICAL ENGINEERING, 2013,
  • [30] Single-track train timetabling with guaranteed optimality: Branch-and-bound algorithms with enhanced lower bounds
    Zhou, Xuesong
    Zhong, Ming
    [J]. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2007, 41 (03) : 320 - 341