Optimizing Bi-level Programming Control of Artery with Environmental Constraint

被引:0
|
作者
Wang, Shaonan [1 ]
Wang, Hui [1 ]
Liu, Hong [2 ]
机构
[1] Zhejiang Univ, Dept Control Sci & Engn, Hangzhou 310027, Zhejiang, Peoples R China
[2] Zhejiang Univ City Coll, Dept Informat & Elect, Hangzhou 310027, Zhejiang, Peoples R China
来源
2015 27TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC) | 2015年
关键词
Bi-level Programming; Vehicular Emission; Air Quality and Arterial Control; EMISSION; OPTIMIZATION;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The area coordinated control of urban traffic is an efficient approach to relieve the urban traffic congestion. In this paper, a hi-level programming model is formulated. In the upper level, we aim to minimize the total time spent in the urban artery, which considers the constraints of sequence phases' starting and duration through the macroscopic traffic flow model. In the lower level, the goal is to maximize the vehicle release rate. In this work, vehicular emissions model is adopted to calculate the emissions and an environmental constraint is introduced by considering the requirement of air quality. Simulation experiments are conducted using data of real road network. Experimental results indicate that our method not only reduces the total time at a rate of approximately 10%, but reduces the concentration of PM2.5 as well.
引用
收藏
页码:3365 / 3370
页数:6
相关论文
共 50 条
  • [31] Optimal subsidies for rail containers: a bi-level programming solution
    Yang, Jinglei
    Luo, Meifeng
    Shi, Meichao
    MARITIME POLICY & MANAGEMENT, 2020, 47 (02) : 172 - 187
  • [32] Focus programming: a bi-level programming approach to static stochastic optimization problems
    Guo, Peijun
    Zhu, Xide
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2023, 30 (06) : 3833 - 3862
  • [33] Spinning Reserve Optimization Model Based on Bi-Level Programming
    Huang Dawei
    Lei Ming
    PROGRESS IN POWER AND ELECTRICAL ENGINEERING, PTS 1 AND 2, 2012, 354-355 : 1047 - 1050
  • [34] A bi-level programming model for location of commodity exchange markets
    Li, Ling-ying
    Qiao, Zhong
    PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON GAME THEORY AND APPLICATIONS, 2007, : 101 - 105
  • [35] THE BI-LEVEL PROGRAMMING METHOD FOR OPTIMAL RATE ON TOLL ROAD
    Wei, Lianyu
    Liu, Shujing
    Liu, Zhaowei
    PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 97 - 102
  • [36] A nonlinear bi-level programming approach for product portfolio management
    Ma, Shuang
    SPRINGERPLUS, 2016, 5
  • [37] Multiobjective bi-level programming for shared inventory with emergency and backorders
    Fouad Ben Abdelaziz
    Sameh Mejri
    Annals of Operations Research, 2018, 267 : 47 - 63
  • [38] A bi-level programming model for optimizing location, capacity, and pricing decisions of origin warehouses in an agricultural supply chain
    Gao, Yiwen
    Wang, Xifu
    Yang, Kai
    Ma, Junchi
    Jiang, Lijun
    Luo, Qin
    APPLIED MATHEMATICAL MODELLING, 2025, 145
  • [39] Multiobjective bi-level programming for shared inventory with emergency and backorders
    Ben Abdelaziz, Fouad
    Mejri, Sameh
    ANNALS OF OPERATIONS RESEARCH, 2018, 267 (1-2) : 47 - 63
  • [40] Study on the inventory control of deteriorating items under VMI model based on bi-level programming
    Lan Hongjie
    Li Ruxian
    Liu Zhigao
    Wang Ruijiang
    EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (08) : 9287 - 9295