共 50 条
- [21] Capacity expansion on the 50 MW extraction steam turbine units Qilunji Jishu/Turbine Technology, 2001, 43 (06):
- [22] CONDENSING THE DUMPED STEAM DURING A TURBINE BYPASS JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 1992, 114 (04): : 621 - 631
- [24] ELIMINATING STEAM BLOW PIPING OVERCLEANING DURING POWER PLANT STARTUP PROCEEDINGS OF THE ASME POWER CONFERENCE 2008, 2008, : 155 - 162
- [25] ALGORITHM FOR ADAPTIVE CONTROL OF HEATING OF TURBINE COMPONENTS DURING STARTUP. Soviet energy technology, 1987, (10): : 13 - 18
- [26] Analysis of Wind Turbine Vibration Characteristics during Startup and Shutdown Process Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2019, 46 (03): : 82 - 89
- [27] Analysis of differential pressure under the accident condition of steam turbine Shanghai Ligong Daxue Xuebao/Journal of University of Shanghai for Science and Technology, 2001, 23 (03):
- [28] Conditions leading to corrosion damage of steam turbine blades during turbine shutdowns PROCEEDINGS OF THE 6TH INTERNATIONAL DESIGN CONFERENCE: DESIGN 2000, 2000, : 141 - 146