Coordinated TCSC Allocation and Network Reinforcements Planning With Wind Power

被引:21
作者
Ugranli, Faruk [1 ]
Karatepe, Engin [2 ]
机构
[1] Bartin Univ, Dept Elect & Elect Engn, TR-74110 Bartin, Turkey
[2] Dokuz Eylul Univ, Dept Elect & Elect Engn, TR-05220 Izmir, Turkey
关键词
FACTS; mixed-integer linear programming; reactive power planning; TCSC; transmission expansion planning; wind power; FACTS DEVICES; REACTIVE POWER; OPTIMAL LOCATION; OPTIMUM ALLOCATION; TRANSMISSION; SYSTEMS; MODEL; TURBINE; PSO;
D O I
10.1109/TSTE.2017.2702105
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Integration of wind power plants into power systems requires special attention on network planning to reduce curtailed wind energy as well as investment costs and generation costs. To this aim, in this study, transmission expansion planning, reactive power planning, and the allocation of TCSC devices are coordinated in order to minimize investment costs of transmission lines, reactive power sources, and TCSC devices along with the sum of generation costs and penalty for load curtailment. Installed wind power plants are modeled by using load-wind scenarios, which are obtained by clustering procedure. They are integrated into the constraints of the proposed method via linearized ac power flow equations. This assures keeping the proposed method as mixed-integer linear programming problem. The proposed method is applied to the Garver 6-bus and IEEE 24-bus RTS test systems under different case studies. Results prove the contributions of the coordinated network planning.
引用
收藏
页码:1694 / 1705
页数:12
相关论文
共 54 条
  • [21] Combination of AC Transmission Expansion Planning and Reactive Power Planning in the restructured power system
    Hooshmand, Rahmat-Allah
    Hemmati, Reza
    Parastegari, Moein
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2012, 55 : 26 - 35
  • [22] Hosseinipoor N., 2010, P 9 INT C ENV EL ENG, V1, P1
  • [23] OPTIMAL REACTIVE POWER PLANNING
    HUGHES, A
    JEE, G
    HSIANG, P
    SHOULTS, RR
    CHEN, MS
    [J]. IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1981, 100 (05): : 2189 - 2196
  • [24] Optimization of AC Transmission System Planning
    Jabr, Rabih A.
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (03) : 2779 - 2787
  • [25] Particle swarm optimisation (PSO) for allocation of FACTS devices in electric transmission systems: A review
    Jordehi, A. Rezaee
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2015, 52 : 1260 - 1267
  • [26] Brainstorm optimisation algorithm (BSOA): An efficient algorithm for finding optimal location and setting of FACTS devices in electric power systems
    Jordehi, A. Rezaee
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2015, 69 : 48 - 57
  • [27] A PSO based approach for multi-stage transmission expansion planning in electricity markets
    Kamyab, Gholam-Reza
    Fotuhi-Firuzabad, Mahmood
    Rashidinejad, Masoud
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2014, 54 : 91 - 100
  • [28] Koninklijk Netherlands Meteorological Institute (KNMI), 2015, 2015 KNMI CLIM SERV
  • [29] Chronological Power Flow for Planning Transmission Systems Considering Intermittent Sources
    Leite da Silva, Armando M.
    da Fonseca Manso, Luiz Antonio
    Sales, Warlley de Sousa
    Flavio, Silvan A.
    Anders, George J.
    de Resende, Leonidas Chaves
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (04) : 2314 - 2322
  • [30] Clustering methods of wind turbines and its application in short-term wind power forecasts
    Liu, Yongqian
    Gao, Xiaoli
    Yan, Jie
    Han, Shuang
    Infield, David G.
    [J]. JOURNAL OF RENEWABLE AND SUSTAINABLE ENERGY, 2014, 6 (05)