Forensic Diagnosis of a Leaking Accident during Excavation

被引:129
作者
Tan, Yong [1 ]
Lu, Ye [2 ]
机构
[1] Tongji Univ, Dept Geotech Engn, Coll Civil Engn, 1239 Siping Rd, Shanghai 200092, Peoples R China
[2] Shanghai Univ, Dept Civil Engn, 99 Shang Da Rd, Shanghai 200444, Peoples R China
基金
中国国家自然科学基金; 上海市自然科学基金;
关键词
Excavation; Construction quality assurance/quality control; Confined aquifer; Aquitard; Leaking; Settlement; Forensic investigation; Contingency plan; BUILDING ADJACENT; SOFT; DEPOSITS;
D O I
10.1061/(ASCE)CF.1943-5509.0001058
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction of a subway station in Shanghai called for a 31.4-33.1-m-deep excavation, which extended through upper impermeable clayey strata into underlying erodible silt and sand aquifer layers. When the north section of this pit nearly bottomed out on July 23, 2013, a sudden outburst of groundwater took place and the pit base was flooded quickly. In the subsequent two days, the adjacent ground and building successively underwent 30-42-mm settlements in a plunging manner. To prevent aggravation of the situation, a contingency plan was initiated quickly in an attempt to seal off the water flow path. By constructing mixed-in-place and jet-grouting piles respectively along the outer and inner perimeters of the diaphragm wall where leakage occurred, flow channels were successfully blocked. Despite this, the building adjacent to the outburst of groundwater suffered long-term postexcavation settlement. Forensic diagnoses show that this through-wall leaking accident was related to two major factors: (1) ignorance of minor leakages emerging two weeks before without adopting any remedial measure; and (2) a flawed slab connector embedded in the confined aquifer layer. Based on visual inspection and retrospective analysis of field monitoring data, the possible leakage flow path and associated ground subsidence zone were mapped and a settlement history of the affected building was reconstructed. Both contractual and technical lessons learned from this accident will be useful for professionals to mitigate or prevent future incidence of through-wall leakage during excavation. (C) 2017 American Society of Civil Engineers.
引用
收藏
页数:15
相关论文
共 25 条
[1]  
[Anonymous], 1999, J PERFORM CONSTR FAC
[2]   Cracking in Walls of a Building Adjacent to a Deep Excavation [J].
Bryson, L. Sebastian ;
Kotheimer, Michael J. .
JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2011, 25 (06) :491-503
[3]   Failure Investigation at a Collapsed Deep Excavation in Very Sensitive Organic Soft Clay [J].
Chen, R. P. ;
Li, Z. C. ;
Chen, Y. M. ;
Ou, C. Y. ;
Hu, Q. ;
Rao, M. .
JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2015, 29 (03)
[4]   Geohazards induced by anthropic activities of geoconstruction: a review of recent failure cases [J].
Elbaz, Khalid ;
Shen, Jack S. ;
Arulrajah, Arul ;
Horpibulsuk, Suksun .
ARABIAN JOURNAL OF GEOSCIENCES, 2016, 9 (18)
[5]   Failure of a Retaining Structure in a Metro Station Excavation in Nanchang City, China [J].
Feng, Shi-Jin ;
Lu, Shi-Feng .
JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2016, 30 (04)
[6]   Response of building adjacent to stiff excavation support system in soft clay [J].
Finno, RJ ;
Bryson, LS .
JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2002, 16 (01) :10-20
[7]  
Han J, 2002, TRANSPORT RES REC, P49
[8]   Initiation and failure mechanism of base instability of excavations in clay triggered by hydraulic uplift [J].
Hong, Y. ;
Ng, C. W. W. ;
Wang, L. Z. .
CANADIAN GEOTECHNICAL JOURNAL, 2015, 52 (05) :599-608
[9]   Forensic diagnosis of a shield tunnel failure [J].
Lee, Wei F. ;
Ishihara, Kenji .
ENGINEERING STRUCTURES, 2010, 32 (07) :1830-1837
[10]   Shield tunneling and environment protection in Shanghai soft ground [J].
Liao, Shao-Ming ;
Liu, Jian-Hang ;
Wang, Ru-Lu ;
Li, Zhi-Ming .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2009, 24 (04) :454-465