Performance of geosynthetic-reinforced pile-supported embankment on soft marine deposit

被引:28
|
作者
Chen, Ren-Peng [1 ]
Liu, Qi-Wei [1 ]
Wang, Han-Lin [1 ,2 ]
Liu, Yuan [1 ]
Ma, Qing-Lei [1 ]
机构
[1] Hunan Univ, Coll Civil Engn, Minist Educ, Key Lab Bldg Safety & Energy Efficiency, Changsha, Peoples R China
[2] Hong Kong Polytech Univ, Dept Civil & Environm Engn, Hung Hom, Kowloon, Hong Kong, Peoples R China
基金
中国国家自然科学基金;
关键词
piles & piling; embankments; field testing & monitoring; MODEL EXPERIMENTS; CLAY; BEHAVIOR; FIELD;
D O I
10.1680/jgeen.19.00136
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
This study presents field investigations of a geosynthetic-reinforced pile-supported embankment for a transformer substation constructed on a soft marine deposit. The tests were performed following three procedures: construction, surcharge loading and consolidation. The soil stress, the accumulative settlement and the excess pore pressure at different locations in the field were monitored. The results indicated that, with the construction height increasing, the excess pore pressure caused by pile installations in the foundation soil decreased slightly and the pile-subsoil differential settlement increased insignificantly. When the differential settlement was relatively small, the soil arching effect developed rapidly as the differential settlement increased, also showing a partially mobilised characteristic. This partially mobilised arching was weakened under surcharge loading. During the consolidation procedure, the excess pore pressure dissipated remarkably, leading to a noticeable increase in the differential settlement. When sufficient differential settlement was reached, the partially mobilised soil arching developed to the fully mobilised state. At this state, the load-sharing ratio or the pile efficacy (ratio of load borne by the pile cap to the total load) remained steady. Furthermore, for the fully mobilised arching, the pile efficacy was well predicted by four analytical models.
引用
收藏
页码:627 / 644
页数:18
相关论文
共 50 条
  • [1] Calculation for pile efficacy of geosynthetic-reinforced and pile-supported embankment
    Zhang J.
    Zheng J.-J.
    Ma Q.
    Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2010, 44 (10): : 1950 - 1954
  • [2] Performance of Geosynthetic-Reinforced and Pile-Supported Embankment with Consideration of Soil Arching
    Zhang, Ling
    Zhou, Shuai
    Zhao, Heng
    Deng, Yun
    JOURNAL OF ENGINEERING MECHANICS, 2018, 144 (12)
  • [3] Geosynthetic-reinforced pile-supported embankment: settlement in different pile conditions
    Shen, P.
    Xu, C.
    Han, J.
    GEOSYNTHETICS INTERNATIONAL, 2020, 27 (03) : 315 - 331
  • [4] Evaluation of an Improved Technique for Geosynthetic-Reinforced and Pile-Supported Embankment
    Zhang, Jun
    Liu, Shao-wen
    Pu, He-fu
    ADVANCES IN MATERIALS SCIENCE AND ENGINEERING, 2015, 2015
  • [5] Seismic performance of near-fault geosynthetic-reinforced pile-supported embankment
    Guo, W.
    Wang, X.
    He, C.
    Jiang, L.
    Long, Y.
    Guo, Z.
    Yan, Q.
    Zhao, L.
    Lin, Y.
    GEOSYNTHETICS INTERNATIONAL, 2022, 30 (05) : 469 - 479
  • [6] Centrifuge testing on the global stability of geosynthetic-reinforced and pile-supported embankment
    Xu C.
    Zeng Q.
    Yang Y.
    Arabian Journal of Geosciences, 2021, 14 (10)
  • [7] Semi-analytical solutions for geosynthetic-reinforced and pile-supported embankment
    Zhang, Ling
    Zhao, Minghua
    Hu, Yuxia
    Zhao, Heng
    Chen, Bingchu
    COMPUTERS AND GEOTECHNICS, 2012, 44 : 167 - 175
  • [8] Long term measurements in the Woerden geosynthetic-reinforced pile-supported embankment
    van Eekelen, S. J. M.
    Venmans, A. A. M.
    Bezuijen, A.
    van Tol, A. F.
    GEOSYNTHETICS INTERNATIONAL, 2020, 27 (02) : 142 - 156
  • [9] Coupled mechanical and hydraulic modeling of a geosynthetic-reinforced and pile-supported embankment
    Zhang, Jun
    Zheng, Jun-Jie
    Chen, Bao-Guo
    Yin, Jian-Hua
    COMPUTERS AND GEOTECHNICS, 2013, 52 : 28 - 37
  • [10] Mechanical Performance of Geosynthetic-Reinforced Pile-Supported Embankments
    Sun, Ling
    Zheng, Jun-Jie
    Zhang, Jun
    Ma, Qiang
    ADVANCED MANUFACTURING TECHNOLOGY, PTS 1, 2, 2011, 156-157 : 1696 - 1701