Scheduling job shop problems with operators with respect to the maximum lateness

被引:3
|
作者
Benkalai, Imene [1 ]
Rebaine, Djamal [1 ]
Baptiste, Pierre [2 ]
机构
[1] Univ Quebec Chicoutimi, Dept Informat & Math, Saguenay, PQ G7H 2B1, Canada
[2] Ecole Polytech Montreal, Dept Math & Genie Ind, Montreal, PQ H3T 1J4, Canada
关键词
Scheduling; job shop; operators; maximum lateness; SINGLE-MACHINE; ROBOTIC CELLS; ALGORITHMS; COST;
D O I
10.1051/ro/2019116
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper deals with the problem of assigning operators to jobs, within a free assignment-changing mode, in a job-shop environment subject to a fixed processing sequence of the jobs. We seek an assignment of operators that minimizes the maximum lateness. Within this model, a job needs an operator during the entire duration of its processing. We show that the problem is MATHEMATICAL SCRIPT CAPITAL N & xdca9;P & xdcab;NP$ \mathcal{NP}$-hard when the number of operators is arbitrary and exhibit polynomial time algorithms for the cases involving one and two operators, respectively.
引用
收藏
页码:555 / 568
页数:14
相关论文
共 50 条
  • [41] Novel Formulation and Resolution of Job-Shop Scheduling Problems
    Yan, Bing
    Bragin, Mikhail A.
    Luh, Peter B.
    IEEE ROBOTICS AND AUTOMATION LETTERS, 2018, 3 (04): : 3387 - 3393
  • [42] An invasive weed optimization approach for job shop scheduling problems
    Mishra, S. K.
    Bose, P. S. C.
    Rao, C. S. P.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2017, 91 (9-12) : 4233 - 4241
  • [43] An invasive weed optimization approach for job shop scheduling problems
    S. K. Mishra
    P. S. C. Bose
    C. S. P. Rao
    The International Journal of Advanced Manufacturing Technology, 2017, 91 : 4233 - 4241
  • [44] Genetic algorithms for job shop scheduling problems with alternative routings
    Moon, Ilkyeong
    Lee, Sanghyup
    Bae, Hyerim
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (10) : 2695 - 2705
  • [45] An iterative refining mechanism for general job shop scheduling problems
    Chiang, TC
    Fu, LC
    2005 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2005, : 203 - 208
  • [46] A note on reverse scheduling with maximum lateness objective
    Li, S. S.
    Brucker, P.
    Ng, C. T.
    Cheng, T. C. E.
    Shakhlevich, N. V.
    Yuan, J. J.
    JOURNAL OF SCHEDULING, 2013, 16 (04) : 417 - 422
  • [47] A note on reverse scheduling with maximum lateness objective
    S. S. Li
    P. Brucker
    C. T. Ng
    T. C. E. Cheng
    N. V. Shakhlevich
    J. J. Yuan
    Journal of Scheduling, 2013, 16 : 417 - 422
  • [48] Accelerated tabu search for no-wait flowshop scheduling problem with maximum lateness criterion
    Wang, Chuyang
    Li, Xiaoping
    Wang, Qian
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 206 (01) : 64 - 72
  • [49] Application of Grey Wolf Optimization for Solving Combinatorial Problems: Job Shop and Flexible Job Shop Scheduling Cases
    Jiang, Tianhua
    Zhang, Chao
    IEEE ACCESS, 2018, 6 : 26231 - 26240
  • [50] A general efficient neighborhood structure framework for the job-shop and flexible job-shop scheduling problems
    Tamssaouet, Karim
    Dauzere-Peres, Stephane
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 311 (02) : 455 - 471