Scheduling job shop problems with operators with respect to the maximum lateness

被引:3
|
作者
Benkalai, Imene [1 ]
Rebaine, Djamal [1 ]
Baptiste, Pierre [2 ]
机构
[1] Univ Quebec Chicoutimi, Dept Informat & Math, Saguenay, PQ G7H 2B1, Canada
[2] Ecole Polytech Montreal, Dept Math & Genie Ind, Montreal, PQ H3T 1J4, Canada
关键词
Scheduling; job shop; operators; maximum lateness; SINGLE-MACHINE; ROBOTIC CELLS; ALGORITHMS; COST;
D O I
10.1051/ro/2019116
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper deals with the problem of assigning operators to jobs, within a free assignment-changing mode, in a job-shop environment subject to a fixed processing sequence of the jobs. We seek an assignment of operators that minimizes the maximum lateness. Within this model, a job needs an operator during the entire duration of its processing. We show that the problem is MATHEMATICAL SCRIPT CAPITAL N & xdca9;P & xdcab;NP$ \mathcal{NP}$-hard when the number of operators is arbitrary and exhibit polynomial time algorithms for the cases involving one and two operators, respectively.
引用
收藏
页码:555 / 568
页数:14
相关论文
共 50 条
  • [31] Job Shop Scheduling Problem with Late Work Criterion
    Piroozfard, Hamed
    Wong, Kuan Yew
    INTERNATIONAL CONFERENCE ON MATHEMATICS, ENGINEERING AND INDUSTRIAL APPLICATIONS 2014 (ICOMEIA 2014), 2015, 1660
  • [32] Study on constraint scheduling algorithm for job shop problems with multiple constraint machines
    Zuo, Yan
    Gu, Hanyu
    Xi, Yugeng
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (17) : 4785 - 4801
  • [33] A flexible job shop scheduling approach with operators for coal export terminals
    Burdett, Robert L.
    Corry, Paul
    Yarlagadda, Prasad K. D. V.
    Eustace, Colin
    Smith, Simon
    COMPUTERS & OPERATIONS RESEARCH, 2019, 104 : 15 - 36
  • [34] Scheduling batches with simultaneous job processing for two-machine shop problems
    Potts, CN
    Strusevich, VA
    Tautenhahn, T
    JOURNAL OF SCHEDULING, 2001, 4 (01) : 25 - 51
  • [35] A parallel genetic-neuro scheduler for job-shop scheduling problems
    Lee, HC
    Dagli, CH
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1997, 51 (1-2) : 115 - 122
  • [36] Optimizing the sum of maximum earliness and tardiness of the job shop scheduling problem
    Yazdani, Maziar
    Aleti, Aldeida
    Khalili, Seyed Mohammad
    Jolai, Fariborz
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 107 : 12 - 24
  • [37] Integration of scheduling and control in a job shop
    Chang, JW
    Luh, YP
    JOURNAL OF THE CHINESE INSTITUTE OF ENGINEERS, 1997, 20 (01) : 67 - 76
  • [38] Job shop scheduling with beam search
    Sabuncuoglu, I
    Bayiz, M
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 118 (02) : 390 - 412
  • [39] Scheduling UET-UCT outforests to minimize maximum lateness
    Singh, G
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 165 (02) : 468 - 478
  • [40] Scheduling of deteriorating jobs with release dates to minimize the maximum lateness
    Miao, Cuixia
    Zhang, Yuzhong
    Wu, Cuilian
    THEORETICAL COMPUTER SCIENCE, 2012, 462 : 80 - 87